Semua | Belum e-Kontrak | Belum Penilaian Kinerja | Selesai | |||||
---|---|---|---|---|---|---|---|---|
Jenis | Paket | Pagu | Paket | Pagu | Paket | Pagu | Paket | Pagu |
Tender | 120 | 197.020.110.288 | 8 | 12.113.846.000 | 120 | 197.020.110.288 | 0 | 0 |
Seleksi | 11 | 3.570.226.037 | 0 | 0 | 11 | 3.570.226.037 | 0 | 0 |
Tender Cepat | 2 | 3.809.215.000 | 0 | 0 | 2 | 3.809.215.000 | 0 | 0 |
Total | 133 | 204.399.551.325 | 8 | 12.113.846.000 | 133 | 204.399.551.325 | 0 | 0 |
Persentase | 6.02 % | 100 % | 0 % |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Pelita | Tender | Pekerjaan Konstruksi | 2993059 | 21885101 | APBD | 513,300,000 | 497,487,373 | 480,514,691 | 480,514,691 | 470,700,000 | 470,700,000 | 0 | 0 | 2019-10-02 | 2019-10-12 | 2019-10-17 | 01.249.085.0-735.000 | CV. SUMBER REZEKI | 01.249.085.0-735.000 | CV. SUMBER REZEKI | 32,785,309 | 6.39 % | Belum dinilai |
2 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Griya Eka Paksi (Lanjutan) | Tender | Pekerjaan Konstruksi | 3028059 | 21884996 | APBD | 335,348,000 | 335,330,389 | 332,774,124 | 332,774,124 | 332,774,000 | 332,774,000 | 0 | 0 | 2019-10-14 | 2019-10-22 | 2019-10-25 | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 2,573,876 | 0.77 % | Belum dinilai |
3 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pembuatan Ruangan Gedung Kantor | Tender | Pekerjaan Konstruksi | 3023059 | 21906807 | APBD | 506,025,000 | 494,834,552 | 479,308,927 | 479,308,927 | 479,308,927 | 479,308,927 | 0 | 0 | 2019-10-14 | 2019-10-23 | 2019-10-31 | 02.919.275.4-735.000 | CV.INDAH PERDANA | 02.919.275.4-735.000 | CV.INDAH PERDANA | 26,716,073 | 5.28 % | Belum dinilai |
4 | 2019 | BADAN PENANGGULANGAN BENCANA DAERAH | Pengadaan Buku Laporan Penyusunan Dokumen Rencana Induk Sistem Proteksi Kebakaran | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2850059 | 19488697 | APBD | 323,321,850 | 300,190,000 | 300,080,000 | 300,080,000 | 300,080,000 | 300,080,000 | 0 | 0 | 2019-08-14 | 2019-09-19 | 2019-09-27 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 0015485642424000 | PT. Belaputera Interplan | 23,241,850 | 7.19 % | Belum dinilai |
5 | 2019 | DINAS KESEHATAN | Instalasi Pengelolaan Limbah (IPAL) Puskesmas | Tender | Pengadaan Barang | 3018059 | 22142685 | APBD | 1,678,385,000 | 1,617,400,000 | 1,612,000,500 | 1,612,000,500 | 1,612,000,500 | 1,612,000,500 | 0 | 0 | 2019-10-11 | 2019-10-22 | 2019-10-30 | 01.355.627.9-013.000 | CV. RIAPRIMA PUTRI AMBAR | 01.355.627.9-013.000 | CV. RIAPRIMA PUTRI AMBAR | 66,384,500 | 3.96 % | Belum dinilai |
6 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Peningkatan Jalan Lingkungan Pasar Mabuun Tembus Muka Wira Toyota | Tender | Pekerjaan Konstruksi | 2985059 | 22131352 | APBD | 544,765,000 | 544,759,775 | 539,300,788 | 539,300,788 | 539,299,000 | 539,299,000 | 0 | 0 | 2019-10-03 | 2019-10-14 | 2019-10-18 | 02.919.208.5-735.000 | CV.BANGUN BANUA | 0029192085735000 | CV.BANGUN BANUA | 5,464,212 | 1 % | Belum dinilai |
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Pintu Air Desa Harus Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2811059 | 21740657 | APBD | 460,000,000 | 458,857,188 | 450,893,468 | 450,893,468 | 450,893,000 | 0 | 0 | 0 | 2019-07-29 | 2019-08-07 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 9,106,532 | 1.98 % | Belum dinilai | |||
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Tribun Tempat Duduk Stadion Mini Andalas Nawin Kec.Haruai | Tender | Pekerjaan Konstruksi | 2760059 | 19458485 | APBD | 2,766,602,000 | 2,766,230,000 | 2,705,378,632 | 2,705,378,632 | 2,705,378,000 | 2,705,378,000 | 0 | 0 | 2019-07-05 | 2019-07-16 | 2019-07-22 | 86.336.554.0-735.000 | PT. RIFQI MULIA JAYA | 86.336.554.0-735.000 | PT. RIFQI MULIA JAYA | 61,223,368 | 2.21 % | Belum dinilai |
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan DED Kebun Raya Tanjung Puri | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2581059 | 21486890 | APBD | 505,000,000 | 504,020,000 | 490,080,800 | 490,080,800 | 490,080,800 | 490,080,800 | 0 | 0 | 2019-05-03 | 2019-06-18 | 2019-07-27 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 0014632632731000 | PT. MATRA ESTETIKA REKAYASA | 14,919,200 | 2.95 % | Belum dinilai |
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan DAM Irigasi Desa Kambitin Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2803059 | 21740668 | APBD | 460,000,000 | 459,090,392 | 429,181,742 | 429,181,742 | 381,878,481 | 0 | 0 | 0 | 2019-07-29 | 2019-08-08 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 30,818,258 | 6.7 % | Belum dinilai | |||
11 | 2019 | PDAM Kabupaten Tabalong | Jasa Konsultan pengawasan Pembangunan IPA kapasitas 50 Liter/detik, rehab rumah jaga operator menjadi bengkel meter dan gedung laboratorium. | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2717059 | 21367293 | BUMD | 310,000,000 | 298,353,000 | 297,649,000 | 297,649,000 | 289,905,000 | 289,905,000 | 0 | 0 | 2019-07-03 | 2019-08-13 | 2019-08-29 | 02.215.319.1-732.000 | CV. POLA ARSITEK KONSULTAN | 0022153191732000 | CV. POLA ARSITEK KONSULTAN | 12,351,000 | 3.98 % | Belum dinilai |
12 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Muara Uya | Tender | Jasa Lainnya | 2487059 | 20190968 | APBD | 345,395,600 | 325,494,724 | 308,418,600 | 308,418,600 | 292,834,400 | 292,834,400 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 36,977,000 | 10.71 % | Belum dinilai |
13 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Tanggul & Pintu Air Desa Pampanan RT.03 Kec. Pugaan dan Pembuatan Pintu Air Di Sungai Tingang Desa Jirak RT.03 Kec. Pugaan | Tender | Pekerjaan Konstruksi | 2813059 | 21740674 | APBD | 1,012,000,000 | 1,008,726,303 | 968,132,635 | 968,132,635 | 965,700,000 | 965,700,000 | 0 | 0 | 2019-07-30 | 2019-08-08 | 2019-08-13 | 02.746.710.9-735.000 | CV.GALANG AMANDIT UTAMA | 02.746.710.9-735.000 | CV.GALANG AMANDIT UTAMA | 43,867,365 | 4.33 % | Belum dinilai |
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Sp.3 Kalingai - Rungun Kec. Bintang Ara, Peningkatan Jalan Rungun - Misim Kec. Bintang Ara dan Peningkatan Jalan Bina Desa Jembatan Sakuyah Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2868059 | 21882137 | APBD | 6,750,000,000 | 6,749,971,911 | 6,611,976,689 | 6,611,976,689 | 6,610,986,000 | 6,610,986,000 | 0 | 0 | 2019-08-13 | 2019-08-23 | 2019-09-04 | 02.475.260.2-735.000 | CV. NAILA RIZKY | 0024752602735000 | CV. NAILA RIZKY | 138,023,311 | 2.04 % | Belum dinilai |
15 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Siring Dan Urugan Desa Tamunti RT.03 Kec. Pugaan | Tender | Pekerjaan Konstruksi | 2815059 | 21753014 | APBD | 634,800,000 | 631,361,126 | 616,774,314 | 616,774,314 | 614,928,000 | 614,928,000 | 0 | 0 | 2019-07-30 | 2019-08-08 | 2019-08-13 | 01.124.250.0-735.000 | CV. Sinar Baru | 01.124.250.0-735.000 | CV. Sinar Baru | 18,025,686 | 2.84 % | Belum dinilai |
16 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Pondok Karet Permai | Tender | Pekerjaan Konstruksi | 3005059 | 21884695 | APBD | 500,000,000 | 499,973,756 | 490,218,944 | 490,218,944 | 490,218,000 | 490,218,000 | 0 | 0 | 2019-10-09 | 2019-10-21 | 2019-10-25 | 02.590.435.0-735.000 | CV. ANDIN WIRANDY | 0025904350735000 | CV. ANDIN WIRANDY | 9,781,056 | 1.96 % | Belum dinilai |
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Siring Jalan/Tanggul D.I.R Tamunti | Tender | Pekerjaan Konstruksi | 2812059 | 21670434 | APBD | 459,172,000 | 455,014,892 | 442,406,725 | 442,406,725 | 442,400,000 | 442,400,000 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-12 | 02.089.920.9-735.000 | CV. PUTRA SABAKA | 02.089.920.9-735.000 | CV. PUTRA SABAKA | 16,765,275 | 3.65 % | Belum dinilai |
18 | 2019 | DINAS LINGKUNGAN HIDUP | Pembangunan Kontruksi Kantor Pengelola TPA Bongkang | Tender | Pekerjaan Konstruksi | 2598059 | 19641151 | APBD | 540,000,000 | 539,997,605 | 529,877,073 | 529,877,073 | 529,877,000 | 529,877,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-28 | 02.590.469.9-735.000 | Cv wanda | 0025904699735000 | Cv wanda | 10,122,927 | 1.87 % | Belum dinilai |
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Desa Harus Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2678059 | 21663574 | APBD | 1,026,760,000 | 1,026,758,901 | 1,000,000,000 | 1,000,000,000 | 1,000,000,000 | 1,000,000,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 26,760,000 | 2.61 % | Belum dinilai |
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Box Culvert Desa Kasiau Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2566059 | 21119982 | APBD | 400,000,000 | 399,999,187 | 389,144,238 | 386,944,238 | 386,944,000 | 386,944,000 | 0 | 0 | 2019-05-09 | 2019-05-20 | 2019-05-29 | 02.590.467.3-735.000 | CV. MENTARI | 0025904673735000 | CV. MENTARI | 10,855,762 | 2.71 % | Belum dinilai |
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas Jalan Barimbun - Sp.3 Mungkur Palawan (Ruas 95) Kec. Tanta spj 1,427 km (DAK Bidang Jalan) | Tender | Pekerjaan Konstruksi | 2626059 | 21375100 | APBD | 2,702,490,000 | 2,702,395,652 | 2,641,473,668 | 2,641,473,668 | 2,640,000,000 | 2,640,000,000 | 0 | 0 | 2019-06-10 | 2019-06-18 | 2019-06-24 | 02.050.793.5-735.000 | CV. SAILA RIZKY | 0020507935735000 | CV. SAILA RIZKY | 61,016,332 | 2.26 % | Belum dinilai |
22 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Gantung Desa Hapalah Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2637059 | 19655062 | APBD | 2,000,000,000 | 1,999,954,766 | 1,958,675,281 | 1,958,675,281 | 1,958,675,000 | 1,958,675,000 | 0 | 0 | 2019-06-10 | 2019-06-20 | 2019-06-26 | 02.172.438.0-735.000 | CV. BATUAH | 02.172.438.0-735.000 | CV. BATUAH | 41,324,719 | 2.07 % | Belum dinilai |
23 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Komplek Stadion - Sp. 3 Majumbi Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2565059 | 19674369 | APBD | 950,000,000 | 869,348,302 | 823,138,729 | 823,138,729 | 823,138,000 | 823,138,000 | 0 | 0 | 2019-05-06 | 2019-05-20 | 2019-05-29 | 31.669.359.7-735.000 | CV.WARDHANA | 0316693597735000 | CV.WARDHANA | 126,861,271 | 13.35 % | Belum dinilai |
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Murung Karangan Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2677059 | 21663586 | APBD | 440,040,000 | 435,638,566 | 423,151,590 | 423,151,590 | 423,150,000 | 423,150,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.421.948.7-735.000 | CV. WINDA PRATAMA | 0024219487735000 | CV. WINDA PRATAMA | 16,888,410 | 3.84 % | Belum dinilai |
25 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal peninggian Jalan Pasar kelua | Tender | Pekerjaan Konstruksi | 2630059 | 19825667 | APBD | 1,284,141,000 | 1,282,273,000 | 1,241,208,500 | 1,241,208,500 | 1,241,208,000 | 1,241,208,000 | 0 | 0 | 2019-05-29 | 2019-06-17 | 2019-06-27 | 02.919.164.0-735.000 | CV. BANGUN KARYA KONSTRUKSI | 0029191640735000 | CV. BANGUN KARYA KONSTRUKSI | 42,932,500 | 3.34 % | Belum dinilai |
26 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Kelahang Regency | Tender | Pekerjaan Konstruksi | 3027059 | 21884760 | APBD | 500,000,000 | 499,983,583 | 468,500,473 | 468,500,473 | 468,500,473 | 468,500,473 | 0 | 0 | 2019-10-16 | 2019-10-29 | 2019-11-06 | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 31,499,527 | 6.3 % | Belum dinilai |
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Padang Lumbu - Batas Kalteng Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2763059 | 19674336 | APBD | 950,000,000 | 949,999,815 | 912,004,143 | 912,004,143 | 904,970,000 | 904,970,000 | 0 | 0 | 2019-07-09 | 2019-07-19 | 2019-07-24 | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 37,995,857 | 4 % | Belum dinilai |
28 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Haruai - Sp. 3 Hayup Kec. Haruai | Tender | Pekerjaan Konstruksi | 2689059 | 19674778 | APBD | 2,863,675,000 | 2,863,665,160 | 2,700,804,470 | 2,700,804,470 | 2,679,675,000 | 2,679,675,000 | 0 | 0 | 2019-06-19 | 2019-07-01 | 2019-07-08 | 83.684.580.0-735.000 | CV. MAHKOTA PUTRI MANDIRI | 0836845800735000 | CV. MAHKOTA PUTRI MANDIRI | 162,870,530 | 5.69 % | Belum dinilai |
29 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Upgrating IPA SPAM Kapasitas 10 liter/detik,Ds.Warukin Kec.Tanta (DAK Bidang Air Minum) | Tender | Pekerjaan Konstruksi | 2619059 | 21520267 | APBD | 3,300,968,000 | 3,300,959,260 | 3,120,461,625 | 3,120,461,625 | 3,120,461,625 | 3,120,461,624 | 0 | 0 | 2019-05-23 | 2019-06-12 | 2019-06-25 | 01.261.321.2-735.000 | PT. SIAM KARYA HUSNA | 01.261.321.2-735.000 | PT. SIAM KARYA HUSNA | 180,506,375 | 5.47 % | Belum dinilai |
30 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Siring Saluran Pembuang Kaong Kec. Upau | Tender | Pekerjaan Konstruksi | 2679059 | 21663554 | APBD | 466,440,000 | 459,446,990 | 445,732,912 | 445,732,912 | 445,727,000 | 445,727,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.919.023.8-735.000 | CV. BAHUNGIN RAYA | 0029190238735000 | CV. BAHUNGIN RAYA | 20,707,088 | 4.44 % | Belum dinilai |
31 | 2019 | DINAS KESEHATAN | Pembangunan Baru Poskesdes Binturu Kecamatan Kelua | Tender | Pekerjaan Konstruksi | 2854059 | 21766833 | APBD | 331,000,000 | 330,610,000 | 313,989,453 | 313,989,453 | 313,967,000 | 313,967,000 | 0 | 0 | 2019-08-15 | 2019-08-26 | 2019-09-02 | 02.172.434.9-735.000 | CV. LANAGIA & Co | 0021724349735000 | CV. LANAGIA & Co | 17,010,547 | 5.14 % | Belum dinilai |
32 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Komplek Flamboyan Asri dan Penanganan PSU Perumahan Anggrek | Tender | Pekerjaan Konstruksi | 3055059 | 22300826 | APBDP | 1,438,791,000 | 1,434,326,473 | 1,405,652,603 | 1,405,652,603 | 1,405,644,000 | 1,405,644,000 | 0 | 0 | 2019-10-22 | 2019-11-02 | 2019-11-05 | 02.019.122.7-735.000 | CV. MANDIRI | 02.019.122.7-735.000 | CV. MANDIRI | 33,138,397 | 2.3 % | Belum dinilai |
33 | 2019 | DINAS PERTANIAN | Pembangunan Gudang Alat dan Mesin Pertanian pada UPT Balai Alsintan | Tender | Pekerjaan Konstruksi | 2984059 | 22058212 | APBDP | 276,195,000 | 276,140,378 | 256,874,176 | 256,874,176 | 256,874,000 | 256,874,000 | 0 | 0 | 2019-09-30 | 2019-10-10 | 2019-10-17 | 02.746.617.6-735.000 | CV VIA TANJUNG LESTARI | 0027466176735000 | CV VIA TANJUNG LESTARI | 19,320,824 | 7 % | Belum dinilai |
34 | 2019 | DINAS KESEHATAN | relokasi poskesdes pasar panas kecamatan kelua | Tender | Pekerjaan Konstruksi | 2853059 | 21766835 | APBD | 417,341,700 | 380,770,000 | 362,014,298 | 362,014,298 | 362,014,000 | 362,014,000 | 0 | 0 | 2019-08-16 | 2019-08-28 | 2019-09-05 | 83.684.580.0-735.000 | CV. MAHKOTA PUTRI MANDIRI | 0836845800735000 | CV. MAHKOTA PUTRI MANDIRI | 55,327,402 | 13.26 % | Belum dinilai |
35 | 2019 | DINAS PERTANIAN | Konstruksi Pembangunan Gudang UPPB di Kecamatan Tanta | Tender | Pekerjaan Konstruksi | 2892059 | 20330478;21969506 | APBD | 801,396,000 | 400,500,254 | 390,174,630 | 390,174,630 | 390,174,000 | 390,174,000 | 0 | 0 | 2019-09-10 | 2019-09-19 | 2019-09-25 | 02.019.129.2-735.000 | CV. RELA BANGUN TATA PERSADA | 02.019.129.2-735.000 | CV. RELA BANGUN TATA PERSADA | 411,221,370 | 51.31 % | Belum dinilai |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Gantung Desa Pangkalan Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2567059 | 19655065 | APBD | 7,985,648,300 | 7,985,468,343 | 7,556,929,660 | 7,556,929,660 | 7,556,929,000 | 7,556,929,000 | 0 | 0 | 2019-05-15 | 2019-05-27 | 2019-06-11 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 428,718,640 | 5.37 % | Belum dinilai |
37 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Permata Hijau | Tender | Pekerjaan Konstruksi | 3051059 | 22021959 | APBDP | 235,000,000 | 229,989,001 | 223,045,410 | 223,045,410 | 223,045,000 | 223,045,000 | 0 | 0 | 2019-10-21 | 2019-10-29 | 2019-11-05 | 70.186.362.3-735.000 | CV. JADI REZEKI BERSAMA | 70.186.362.3-735.000 | CV. JADI REZEKI BERSAMA | 11,954,590 | 5.09 % | Belum dinilai |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Hapalah Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2673059 | 21663601 | APBD | 528,000,000 | 525,307,012 | 514,355,973 | 514,355,973 | 514,355,000 | 514,355,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.590.745.2-735.000 | CV. BANGUN BANUA | 0025907452735000 | CV. BANGUN BANUA | 13,644,027 | 2.58 % | Belum dinilai |
39 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi Pamarangan Kiwa Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2672059 | 21663502 | APBD | 1,039,640,000 | 1,039,633,495 | 987,651,390 | 987,651,390 | 987,651,000 | 987,651,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-03 | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 51,988,610 | 5 % | Belum dinilai |
40 | 2019 | DINAS PENDIDIKAN | Lanjutan Pembangunan Kampung Budaya | Tender | Pekerjaan Konstruksi | 2968059 | 21959149 | APBD | 230,223,700 | 229,124,000 | 216,941,285 | 216,941,285 | 207,294,000 | 207,294,000 | 0 | 0 | 2019-09-23 | 2019-10-02 | 2019-10-08 | 02.172.434.9-735.000 | CV. LANAGIA & Co | 0021724349735000 | CV. LANAGIA & Co | 13,282,415 | 5.77 % | Belum dinilai |
41 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Sei. Durian - Tabur Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2647059 | 19663652 | APBD | 2,263,700,000 | 2,262,550,000 | 2,205,823,805 | 2,205,823,805 | 2,205,823,000 | 2,205,823,000 | 0 | 0 | 2019-06-10 | 2019-06-20 | 2019-06-25 | 01.249.113.0-731.000 | CV. Prestasi Utama | 0012491130731000 | CV. Prestasi Utama | 57,876,195 | 2.56 % | Belum dinilai |
42 | 2019 | PDAM Kabupaten Tabalong | Pembangunan IPA kapasitas 50 Liter/detik, rehab rumah jaga operator menjadi bengkel meter dan gedung laboratorium. | Tender | Pekerjaan Konstruksi | 2561059 | 21367374 | BUMD | 7,260,000,000 | 6,679,379,107 | 6,288,570,884 | 6,288,570,884 | 6,288,570,884 | 6,288,570,000 | 0 | 0 | 2019-08-08 | 2019-08-21 | 2019-09-13 | 01.585.283.3-731.000 | CV.BRAMA JR | 01.585.283.3-731.000 | CV.BRAMA JR | 971,429,116 | 13.38 % | Belum dinilai |
43 | 2019 | DINAS PERIKANAN | Pengadaan Peralatan Perikanan Tangkap (DAK Fisik) | Tender | Pengadaan Barang | 2645059 | 21660413 | APBD | 726,225,000 | 726,225,000 | 696,900,000 | 696,900,000 | 696,900,000 | 696,900,000 | 0 | 0 | 2019-06-10 | 2019-06-21 | 2019-07-08 | 02.533.874.0-714.000 | CV.KRINA | 02.533.874.0-714.000 | CV.KRINA | 29,325,000 | 4.04 % | Belum dinilai |
44 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Haruai | Tender | Jasa Lainnya | 2486059 | 20190961 | APBD | 401,645,090 | 375,350,434 | 355,239,900 | 355,239,900 | 336,569,900 | 336,569,900 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 46,405,190 | 11.55 % | Belum dinilai |
45 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Loyang Indah | Tender | Pekerjaan Konstruksi | 3045059 | 21977101 | APBDP | 500,000,000 | 499,460,301 | 482,512,635 | 482,512,635 | 482,512,000 | 482,512,000 | 0 | 0 | 2019-10-21 | 2019-10-30 | 2019-11-06 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 17,487,365 | 3.5 % | Belum dinilai |
46 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Citra Hutama Mabuun | Tender | Pekerjaan Konstruksi | 2930059 | 21839969 | APBD | 500,000,000 | 499,999,844 | 496,740,746 | 496,740,746 | 496,740,000 | 496,740,000 | 0 | 0 | 2019-09-16 | 2019-09-25 | 2019-10-02 | 91.095.112.8-735.000 | CV AR-RAHIM | 0910951128735000 | CV AR-RAHIM | 3,259,254 | 0.65 % | Belum dinilai |
47 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Gantung Desa Burum Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2631059 | 19655059 | APBD | 3,000,000,000 | 2,999,885,321 | 2,911,042,236 | 2,911,042,236 | 2,911,042,236 | 2,911,042,236 | 0 | 0 | 2019-06-10 | 2019-06-18 | 2019-07-02 | 01.203.944.2-732.000 | CV. Sari Alam Utama | 01.203.944.2-732.000 | CV. Sari Alam Utama | 88,957,764 | 2.97 % | Belum dinilai |
48 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Revitalisasi Pasar Wayau Kecamatan Tanjung | Tender | Pekerjaan Konstruksi | 2697059 | 21694219 | APBD | 1,642,616,000 | 1,641,081,283 | 1,542,445,169 | 1,542,445,169 | 1,542,445,169 | 1,624,839,396 | 0 | 0 | 2019-06-21 | 2019-07-03 | 2019-07-19 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 81.211.787.7-735.000 | CV. SEMAN SHATI | 100,170,831 | 6.1 % | Belum dinilai |
49 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Komp. Sulingan Indah Permata | Tender | Pekerjaan Konstruksi | 3047059 | 21872489 | APBD | 500,000,000 | 494,446,801 | 454,385,266 | 454,385,266 | 454,385,000 | 454,385,000 | 0 | 0 | 2019-10-21 | 2019-10-29 | 2019-11-05 | 91.095.112.8-735.000 | CV AR-RAHIM | 0910951128735000 | CV AR-RAHIM | 45,614,734 | 9.12 % | Belum dinilai |
50 | 2019 | BADAN PENANGGULANGAN BENCANA DAERAH | Pembuatan tempat Parkir Mobil dan Kantor TRC Tingkat 2 (6x12 M2) | Tender | Pekerjaan Konstruksi | 2841059 | 21785588 | APBD | 313,515,000 | 313,508,573 | 303,990,696 | 303,990,696 | 303,990,696 | 303,990,696 | 0 | 0 | 2019-08-01 | 2019-08-14 | 2019-10-22 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 9,524,304 | 3.04 % | Belum dinilai |
51 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Peningkatan jalan kampung Durian Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 3024059 | 21966185 | APBDP | 459,975,000 | 454,650,107 | 441,000,777 | 441,000,777 | 441,000,000 | 441,000,000 | 0 | 0 | 2019-10-11 | 2019-10-21 | 2019-10-24 | 02.919.164.0-735.000 | CV. BANGUN KARYA KONSTRUKSI | 0029191640735000 | CV. BANGUN KARYA KONSTRUKSI | 18,974,223 | 4.13 % | Belum dinilai |
52 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Kambitin-Pangi (Ruas 109) Kec. Tanjung spj. 4,800 km (DAK Bidang Jalan) dan Pemeliharaan Berkala Jalan Kambitin - Pangi Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2633059 | 21566562 | APBD | 8,170,848,000 | 8,170,613,370 | 7,680,500,326 | 7,680,500,326 | 7,612,241,000 | 7,612,241,000 | 0 | 0 | 2019-06-10 | 2019-06-18 | 2019-06-27 | 02.675.210.5-735.000 | cv.sumber karya mulia | 02.675.210.5-735.000 | cv.sumber karya mulia | 490,347,674 | 6 % | Belum dinilai |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Irigasi Desa Madang Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2669059 | 21663611 | APBD | 434,814,000 | 430,380,273 | 425,226,447 | 425,226,447 | 425,226,000 | 425,226,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 9,587,553 | 2.2 % | Belum dinilai |
54 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Girder Desa Burum Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2828059 | 21815663 | APBD | 2,250,000,000 | 2,249,403,580 | 2,200,839,394 | 2,200,839,394 | 2,199,127,400 | 2,199,127,400 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-12 | 73.589.728.2-731.000 | CV.PEILANI PUTRA | 73.589.728.2-731.000 | CV.PEILANI PUTRA | 49,160,606 | 2.18 % | Belum dinilai |
55 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Teknis Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2453059 | 19455125 | APBD | 250,000,000 | 249,947,500 | 248,215,000 | 248,215,000 | 248,215,000 | 248,215,000 | 0 | 0 | 2019-02-21 | 2019-03-28 | 2019-04-15 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 0024308173731000 | PT. KINARYA ALAM RAYA | 1,785,000 | 0.71 % | Belum dinilai |
56 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Banua Lawas | Tender | Jasa Lainnya | 2489059 | 20190971 | APBD | 273,713,513 | 262,869,512 | 242,951,750 | 242,951,750 | 242,951,750 | 242,951,750 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 01.124.213.8-735.000 | CV.BERKAT KAWAN | 0011242138735000 | CV.BERKAT KAWAN | 30,761,763 | 11.24 % | Belum dinilai |
57 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Saluran Air Desa Nawin Kec. Haruai | Tender | Pekerjaan Konstruksi | 2829059 | 21516687 | APBD | 690,000,000 | 689,003,925 | 668,149,395 | 668,149,395 | 668,149,000 | 668,149,000 | 0 | 0 | 2019-07-31 | 2019-08-09 | 2019-08-26 | 71.710.772.6-735.000 | CV.cipta banua | 0717107726735000 | CV.cipta banua | 21,850,605 | 3.17 % | Belum dinilai |
58 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal Rehab Kantin Beras Pasar Kelua | Tender | Pekerjaan Konstruksi | 2612059 | 19825645 | APBD | 398,200,000 | 398,198,000 | 384,055,369 | 384,055,369 | 330,377,679 | 330,377,679 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-25 | 81.093.382.0-735.000 | CV. JASA BERSAMA | 0810933820735000 | CV. JASA BERSAMA | 14,144,631 | 3.55 % | Belum dinilai |
59 | 2019 | DINAS KESEHATAN | Pembangunan Baru Poskesdes Sungai Anyar Kecamatan Banua Lawas | Tender | Pekerjaan Konstruksi | 2876059 | 21766817 | APBD | 350,000,000 | 349,450,000 | 338,928,029 | 338,928,029 | 338,928,000 | 338,928,000 | 0 | 0 | 2019-08-16 | 2019-08-27 | 2019-09-05 | 82.869.563.5-735.000 | CV. HIKMAH RIDHO | 0828695635735000 | CV. HIKMAH RIDHO | 11,071,971 | 3.16 % | Belum dinilai |
60 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan Tiang Lampu PJU | Tender | Pengadaan Barang | 2605059 | 20190952 | APBD | 500,000,000 | 330,620,400 | 305,000,000 | 305,000,000 | 305,000,000 | 305,000,000 | 0 | 0 | 2019-05-23 | 2019-06-12 | 2019-06-26 | 01.124.213.8-735.000 | CV.BERKAT KAWAN | 0011242138735000 | CV.BERKAT KAWAN | 195,000,000 | 39 % | Belum dinilai |
61 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Komp. Citra Plambon Raya | Tender | Pekerjaan Konstruksi | 2928059 | 21884565 | APBD | 500,000,000 | 494,274,841 | 489,887,893 | 489,887,893 | 489,887,000 | 489,887,000 | 0 | 0 | 2019-09-10 | 2019-09-19 | 2019-09-30 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 10,112,107 | 2.02 % | Belum dinilai |
62 | 2019 | SEKRETARIAT DPRD | Belanja Makan Minum Rapat | Tender | Jasa Lainnya | 2513059 | 20959083 | APBD | 875,815,000 | 652,915,000 | 522,482,250 | 522,482,250 | 522,482,250 | 522,482,250 | 0 | 0 | 2019-03-26 | 2019-04-08 | 2019-04-16 | 02.421.948.7-735.000 | CV. WINDA PRATAMA | 0024219487735000 | CV. WINDA PRATAMA | 353,332,750 | 40.34 % | Belum dinilai |
63 | 2019 | DINAS KESEHATAN | jasa konsultan pengawasan Pembangunan Gedung Rumah sakit | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2767059 | 21766832 | APBD | 511,544,500 | 511,544,500 | 414,854,000 | 414,854,000 | 414,854,000 | 414,854,000 | 0 | 0 | 2019-07-12 | 2019-08-12 | 2019-08-21 | 01.555.547.7-429.000 | PT. ALOCITA MANDIRI | 01.555.547.7-429.000 | PT. ALOCITA MANDIRI | 96,690,500 | 18.9 % | Belum dinilai |
64 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Lanjutan penanganan jalan di desa Hayup Kec. Haruai | Tender | Pekerjaan Konstruksi | 2998059 | 21966015 | APBD | 1,500,000,000 | 1,499,986,273 | 1,450,645,611 | 1,450,645,611 | 1,450,535,000 | 1,450,535,000 | 0 | 0 | 2019-10-03 | 2019-10-14 | 2019-10-18 | 01.585.142.1-735.000 | CV. PATRA JASA UTAMA | 0015851421735000 | CV. PATRA JASA UTAMA | 49,354,389 | 3.29 % | Belum dinilai |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Pipa Distribusi IKK Upau Ke arah Desa Masingai I dan II | Tender | Pekerjaan Konstruksi | 2795059 | 21744976 | APBD | 5,430,177,600 | 5,430,139,114 | 5,268,233,737 | 5,268,233,737 | 5,268,000,000 | 5,268,000,000 | 0 | 0 | 2019-07-15 | 2019-07-25 | 2019-07-30 | 02.590.746.0-735.000 | CV.Firza Pratama | 02.590.746.0-735.000 | CV.Firza Pratama | 161,943,863 | 2.98 % | Belum dinilai |
66 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal Pembangunan Los Pasar Panas | Tender | Pekerjaan Konstruksi | 2710059 | 21697198 | APBD | 1,495,500,000 | 1,494,840,523 | 1,484,857,977 | 1,484,857,977 | 1,484,857,977 | 0 | 0 | 0 | 2019-07-01 | 2019-07-31 | 02.242.745.4-735.000 | CV. SAWARGA SURYA SAKTI | 10,642,023 | 0.71 % | Belum dinilai | |||
67 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal Pembangunan Los Pasar Panas | Tender | Pekerjaan Konstruksi | 2710059 | 21697198 | APBD | 1,495,500,000 | 1,494,840,523 | 0 | 0 | 0 | 0 | 0 | 0 | 2019-07-01 | 2019-07-31 | 75.321.613.4-735.000 | CV. JAWAHIR PRATAMA | 1,495,500,000 | 100 % | Belum dinilai | |||
68 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Samping SPBU Maburai | Tender | Pekerjaan Konstruksi | 3054059 | 21885049 | APBD | 330,347,000 | 325,679,635 | 314,346,773 | 314,346,773 | 314,346,000 | 314,346,000 | 0 | 0 | 2019-10-21 | 2019-10-29 | 2019-11-06 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 16,000,227 | 4.84 % | Belum dinilai |
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas WTP Belimbing 100 lt/detik Kecamatan Murung Pudak | Tender | Pekerjaan Konstruksi | 2628059 | 21642965 | APBD | 7,942,780,000 | 7,942,437,698 | 7,623,571,074 | 7,623,571,074 | 7,623,571,074 | 7,623,571,000 | 0 | 0 | 2019-05-28 | 2019-06-18 | 2019-06-28 | 01.740.955.8-735.000 | PT. PUSPA HAYUDY HARJO | 0017409558735000 | PT. PUSPA HAYUDY HARJO | 319,208,926 | 4.02 % | Belum dinilai |
70 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 3025059 | 22158376 | APBD | 2,000,000,000 | 1,999,703,630 | 1,981,904,632 | 1,981,904,632 | 1,981,904,632 | 1,981,904,000 | 0 | 0 | 2019-10-16 | 2019-10-25 | 2019-11-07 | 91.095.112.8-735.000 | CV AR-RAHIM | 0910951128735000 | CV AR-RAHIM | 18,095,368 | 0.9 % | Belum dinilai |
71 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Siring Tanggul Dan Penimbunan Tanah Urug Desa Banua Lawas Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2826059 | 21753032 | APBD | 634,800,000 | 628,452,000 | 620,013,689 | 620,013,689 | 620,012,000 | 620,012,000 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-12 | 75.429.962.6-735.000 | CV.INARA | 75.429.962.6-735.000 | CV.INARA | 14,786,311 | 2.33 % | Belum dinilai |
72 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Kelua | Tender | Jasa Lainnya | 2484059 | 20190974 | APBD | 379,528,750 | 369,525,700 | 332,054,450 | 332,054,450 | 332,054,450 | 332,054,450 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 01.124.213.8-735.000 | CV.BERKAT KAWAN | 0011242138735000 | CV.BERKAT KAWAN | 47,474,300 | 12.51 % | Belum dinilai |
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kuari - Mihol Kec. Bintang Ara dan Peningkatan Jalan Burum - Sp.3 Mihol Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2869059 | 21882158 | APBD | 7,674,808,050 | 7,674,785,335 | 7,397,638,346 | 7,397,638,346 | 7,397,638,000 | 7,397,638,000 | 0 | 0 | 2019-08-12 | 2019-08-23 | 2019-09-04 | 02.590.894.8-735.000 | CV. NUR SHIFFA | 0025908948735000 | CV. NUR SHIFFA | 277,169,704 | 3.61 % | Belum dinilai |
74 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Luk Bayur dan Irigasi Sekunder Kec. Tanta | Tender | Pekerjaan Konstruksi | 2670059 | 21663568 | APBD | 1,214,400,000 | 1,208,937,319 | 1,141,497,073 | 1,141,497,073 | 1,141,497,000 | 1,141,497,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.590.894.8-735.000 | CV. NUR SHIFFA | 0025908948735000 | CV. NUR SHIFFA | 72,902,927 | 6 % | Belum dinilai |
75 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Lanjutan penanganan jalan di desa Ribang I kec. M.Uya | Tender | Pekerjaan Konstruksi | 2992059 | 21827046 | APBD | 1,500,000,000 | 1,499,988,999 | 1,455,306,247 | 1,455,306,247 | 1,454,750,000 | 1,454,750,000 | 0 | 0 | 2019-10-02 | 2019-10-15 | 2019-10-18 | 01.124.248.4-735.000 | CV. SETIA WARGA | 01.124.248.4-735.000 | CV. SETIA WARGA | 44,693,753 | 2.98 % | Belum dinilai |
76 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Murung Pudak Luar Kota | Tender | Jasa Lainnya | 2488059 | 20190965 | APBD | 238,262,750 | 215,849,900 | 209,493,900 | 209,493,900 | 209,321,200 | 209,321,200 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 28,768,850 | 12.07 % | Belum dinilai |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Jalan Tohe - Danau Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2618059 | 19674763 | APBD | 1,925,845,000 | 1,924,196,784 | 1,802,889,624 | 1,802,889,624 | 1,799,368,000 | 1,799,368,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-20 | 02.919.061.8-735.000 | CV. Multi Raya Kambitin | 0029190618735000 | CV. Multi Raya Kambitin | 122,955,376 | 6.38 % | Belum dinilai |
78 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Saluran Drainase/Gorong-gorong Jalan Subur - Ayah (Randu) Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2625059 | 19693879 | APBD | 500,000,000 | 499,934,143 | 479,932,878 | 479,932,878 | 479,932,000 | 479,932,000 | 0 | 0 | 2019-05-23 | 2019-06-17 | 2019-06-26 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 20,067,122 | 4.01 % | Belum dinilai |
79 | 2019 | DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB | Bangunan Balai Penyuluhan KB 2 Buah (2 Kecamatan),Pengadaan Alat Kantor dan Pengadaan Alat Rumah Tangga | Tender | Pekerjaan Konstruksi | 2650059 | 21664233 | APBD | 951,425,000 | 950,740,282 | 899,801,132 | 899,801,132 | 899,801,132 | 899,801,132 | 0 | 0 | 2019-06-11 | 2019-06-20 | 2019-07-02 | 83.673.082.0-735.000 | CV. BIMA PERSADA | 0836730820735000 | CV. BIMA PERSADA | 51,623,868 | 5.43 % | Belum dinilai |
80 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Balanti Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2898059 | 21895162 | APBD | 450,000,000 | 449,248,912 | 427,000,001 | 427,000,001 | 427,000,000 | 427,000,000 | 0 | 0 | 2019-08-23 | 2019-09-04 | 2019-09-06 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 22,999,999 | 5.11 % | Belum dinilai |
81 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sheet Pile Desa Kapar Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2902059 | 21821819 | APBD | 1,000,000,000 | 999,999,888 | 984,545,328 | 984,545,328 | 978,886,000 | 978,886,000 | 0 | 0 | 2019-08-29 | 2019-09-11 | 2019-09-30 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 15,454,672 | 1.55 % | Belum dinilai |
82 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyiringan Saluran Irigasi Desa Liang Tapah Kec. Jaro | Tender | Pekerjaan Konstruksi | 2802059 | 21516684 | APBD | 828,000,000 | 821,882,693 | 770,000,000 | 770,000,000 | 770,000,000 | 770,000,000 | 0 | 0 | 2019-08-01 | 2019-08-15 | 2019-08-28 | 02.475.451.7-735.000 | CV. YUDHA DARMA MANDIRI | 02.475.451.7-735.000 | CV. YUDHA DARMA MANDIRI | 58,000,000 | 7 % | Belum dinilai |
83 | 2019 | DINAS KESEHATAN | Pembangunan Gedung Rumah sakit | Tender | Pekerjaan Konstruksi | 2824059 | 21766837 | APBD | 24,333,079,800 | 23,945,543,000 | 22,029,966,235 | 22,029,966,235 | 22,029,966,235 | 22,029,966,234 | 0 | 0 | 2019-07-29 | 2019-08-10 | 2019-08-21 | 02.111.029.1-712.000 | pt. heral eranio jaya | 02.111.029.1-712.000 | pt. heral eranio jaya | 2,303,113,565 | 9.46 % | Belum dinilai |
84 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Siring Jembatan Gantung Marindi Kec. Haruai | Tender | Pekerjaan Konstruksi | 2987059 | 21903658 | APBDP | 626,915,000 | 626,915,000 | 580,000,001 | 580,000,001 | 570,181,000 | 570,181,000 | 0 | 0 | 2019-10-01 | 2019-10-14 | 2019-10-16 | 02.919.299.4-735.000 | CV.SPACE PLAN | 02.919.299.4-735.000 | CV.SPACE PLAN | 46,914,999 | 7.48 % | Belum dinilai |
85 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Rehab Pagar, Halaman, Tempat Parkir dan WC Out Door | Tender | Pekerjaan Konstruksi | 2899059 | 21925321 | APBD | 605,993,385 | 605,993,047 | 581,755,404 | 581,227,404 | 581,227,000 | 581,227,000 | 0 | 0 | 2019-08-31 | 2019-09-11 | 2019-09-17 | 02.590.745.2-735.000 | CV. BANGUN BANUA | 0025907452735000 | CV. BANGUN BANUA | 24,237,981 | 4 % | Belum dinilai |
86 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Teknis Pengadaan dan Pemasangan Pipa Jaringan PDAM Desa Tamunti dan Desa Sei Rukam II Kecamatan Pugaan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2449059 | 19452936 | APBD | 180,000,000 | 179,960,000 | 176,550,000 | 176,550,000 | 176,550,000 | 176,550,000 | 0 | 0 | 2019-02-19 | 2019-03-28 | 2019-04-15 | 01.647.863.8-731.000 | CV. Mitra Jasa | 01.647.863.8-731.000 | CV. Mitra Jasa | 3,450,000 | 1.92 % | Belum dinilai |
87 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Modal Pembangunan Trotoar Mabuun-Batas Kota Kec. Murung Pudak (DID Kesejahteraan) - Pembangunan Trotoar Mabuun-Batas Kota Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2793059 | 21788643 | APBD | 2,782,974,000 | 2,782,973,930 | 2,646,144,691 | 2,646,144,691 | 2,646,144,691 | 2,646,144,690 | 0 | 0 | 2019-07-12 | 2019-07-24 | 2019-07-31 | 83.684.580.0-735.000 | CV. MAHKOTA PUTRI MANDIRI | 0836845800735000 | CV. MAHKOTA PUTRI MANDIRI | 136,829,309 | 4.92 % | Belum dinilai |
88 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Binjai - Salikung Kec. Muara Uya, Peningkatan Jalan Sp.3 Kumap - Desa Kumap Kec. Muara Uya dan Peningkatan Jalan Salikung - Memban Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2866059 | 21882141 | APBD | 7,750,000,000 | 7,749,981,934 | 7,643,186,284 | 7,643,186,284 | 7,643,186,000 | 7,643,186,000 | 0 | 0 | 2019-08-13 | 2019-08-24 | 2019-09-02 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 106,813,716 | 1.38 % | Belum dinilai |
89 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Slab Beton Desa Masukau Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2872059 | 21895163 | APBD | 3,000,000,000 | 2,999,983,913 | 2,950,000,014 | 2,950,000,014 | 2,935,000,000 | 2,935,000,000 | 0 | 0 | 2019-08-16 | 2019-08-27 | 2019-09-03 | 02.675.210.5-735.000 | cv.sumber karya mulia | 02.675.210.5-735.000 | cv.sumber karya mulia | 49,999,986 | 1.67 % | Belum dinilai |
90 | 2019 | DINAS KESEHATAN | Pembangunan Baru Poskesdes Kapar Kecamatan Murung Pudak | Tender | Pekerjaan Konstruksi | 2855059 | 21766818 | APBD | 350,000,000 | 347,210,000 | 332,581,077 | 332,581,077 | 329,000,000 | 329,000,000 | 0 | 0 | 2019-08-16 | 2019-08-27 | 2019-09-02 | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 17,418,923 | 4.98 % | Belum dinilai |
91 | 2019 | DINAS LINGKUNGAN HIDUP | Pengadaan Alat Angkut Sampah Dump Truck ( DAK Penugasan Bidang Lingkungan Hidup ) | Tender Cepat | Pengadaan Barang | 2668059 | 21685496 | APBD | 420,000,000 | 412,190,000 | 411,140,000 | 411,140,000 | 411,140,000 | 411,140,000 | 0 | 0 | 2019-06-17 | 2019-06-19 | 2019-06-24 | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 8,860,000 | 2.11 % | Belum dinilai |
92 | 2019 | DINAS PERHUBUNGAN | Paket II (Rehabilitasi Marka Jalan/Zebra Cross di Jalan Kabupaten Luar Kawasan Tertib Lalu Lintas | Tender | Pekerjaan Konstruksi | 2973059 | 21919484 | APBDP | 865,500,000 | 801,870,455 | 761,749,249 | 761,749,249 | 761,749,000 | 761,749,000 | 0 | 0 | 2019-09-25 | 2019-10-07 | 2019-10-16 | 02.590.439.2-735.000 | CV.KELUA MANDIRI | 0025904392735000 | CV.KELUA MANDIRI | 103,750,751 | 11.99 % | Belum dinilai |
93 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Halaman Kantor Kejaksaan Negeri Tanjung | Tender | Pekerjaan Konstruksi | 2819059 | 21811986 | APBD | 525,000,000 | 359,545,708 | 348,421,018 | 348,421,018 | 348,421,000 | 348,421,000 | 0 | 0 | 2019-07-26 | 2019-08-07 | 2019-08-12 | 90.165.294.1-735.000 | CV. BANUA PRIMA | 90.165.294.1-735.000 | CV. BANUA PRIMA | 176,578,982 | 33.63 % | Belum dinilai |
94 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Jasa Konsultansi Revisi RTRW Kabupaten Tabalong. | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2594059 | 21488450 | APBD | 700,000,000 | 685,693,250 | 685,300,000 | 685,300,000 | 685,300,000 | 685,300,000 | 0 | 0 | 2019-05-07 | 2019-06-20 | 2019-07-03 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 0024308173731000 | PT. KINARYA ALAM RAYA | 14,700,000 | 2.1 % | Belum dinilai |
95 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Teknis Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2759059 | 21744874 | APBD | 150,000,000 | 149,820,000 | 148,032,500 | 148,032,500 | 148,032,500 | 148,032,500 | 0 | 0 | 2019-07-04 | 2019-08-09 | 2019-08-27 | 02.531.482.4-731.000 | cv.akmalindo | 02.531.482.4-731.000 | cv.akmalindo | 1,967,500 | 1.31 % | Belum dinilai |
96 | 2019 | DINAS PERHUBUNGAN | Pembangunan Tempat Parkir / Garasi/ Pool Angkutan | Tender | Pekerjaan Konstruksi | 2607059 | 19845871 | APBD | 370,000,000 | 369,986,375 | 359,528,534 | 359,528,534 | 359,528,000 | 359,528,000 | 0 | 0 | 2019-05-17 | 2019-05-29 | 2019-07-04 | 02.675.218.8-735.000 | CV.KARTIKA RANCANG PRATAMA | 0026752188735000 | CV.KARTIKA RANCANG PRATAMA | 10,471,466 | 2.83 % | Belum dinilai |
97 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Teknis Pengadaan dan Pemasangan Pipa Distribusi IKK Upau ke arah Desa Masingai I dan II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2761059 | 21744906 | APBD | 176,775,000 | 176,137,500 | 171,008,750 | 171,008,750 | 171,008,750 | 171,008,750 | 0 | 0 | 2019-07-09 | 2019-08-14 | 2019-08-28 | 02.531.482.4-731.000 | cv.akmalindo | 02.531.482.4-731.000 | cv.akmalindo | 5,766,250 | 3.26 % | Belum dinilai |
98 | 2019 | DINAS KETAHANAN PANGAN | Pembangunan gudang cadangan pangan pemerintah daerah | Tender | Pekerjaan Konstruksi | 2659059 | 20781830 | APBD | 1,700,000,000 | 1,699,978,713 | 1,615,068,504 | 1,615,068,504 | 1,615,068,504 | 1,615,068,504 | 0 | 0 | 2019-06-13 | 2019-06-24 | 2019-07-04 | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 84,931,496 | 5 % | Belum dinilai |
99 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Ruang CAT dan Ruang Arsip dan Pagar Badan Kepegawaian Pendidikan dan Pelatihan Kab. Tabalong | Tender | Pekerjaan Konstruksi | 2682059 | 21684953 | APBD | 883,889,000 | 883,884,463 | 857,265,198 | 857,265,198 | 857,265,000 | 857,265,000 | 0 | 0 | 2019-06-18 | 2019-06-27 | 2019-07-05 | 02.590.435.0-735.000 | CV. ANDIN WIRANDY | 0025904350735000 | CV. ANDIN WIRANDY | 26,623,802 | 3.01 % | Belum dinilai |
100 | 2019 | DINAS KOPERASI USAHA KECIL DAN MENENGAH | Pembangunan PLUT-KUMKM | Tender | Pekerjaan Konstruksi | 2785059 | 21772303 | APBN | 2,043,046,000 | 2,043,037,765 | 1,930,000,778 | 1,930,000,778 | 1,930,000,778 | 0 | 0 | 0 | 2019-07-16 | 2019-07-26 | 83.673.082.0-735.000 | CV. BIMA PERSADA | 113,045,222 | 5.53 % | Belum dinilai | |||
101 | 2019 | DINAS TENAGA KERJA | Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Kantor- Belanja modal pembangunan ruang kelas dan ruang praktek | Tender | Pekerjaan Konstruksi | 2782059 | 21766884 | APBD | 533,325,000 | 532,334,232 | 516,271,611 | 516,271,611 | 510,206,130 | 510,206,130 | 0 | 0 | 2019-07-24 | 2019-08-06 | 2019-09-02 | 02.590.482.2-735.000 | CV. KARYA PERDANA | 02.590.482.2-735.000 | CV. KARYA PERDANA | 17,053,389 | 3.2 % | Belum dinilai |
102 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kaong - Manakin Kec. Upau | Tender | Pekerjaan Konstruksi | 2787059 | 21708706 | APBD | 1,250,000,000 | 1,249,950,107 | 1,221,052,418 | 1,221,052,418 | 1,221,050,000 | 1,221,050,000 | 0 | 0 | 2019-07-11 | 2019-07-23 | 2019-08-05 | 02.935.016.2-735.000 | CV TABALONG | 02.935.016.2-735.000 | CV TABALONG | 28,947,582 | 2.32 % | Belum dinilai |
103 | 2019 | DINAS LINGKUNGAN HIDUP | Pengadaan Sweeper Truck | Tender Cepat | Pengadaan Barang | 2920059 | 21894304 | APBDP | 3,389,215,000 | 3,282,900,000 | 3,255,000,000 | 3,255,000,000 | 3,255,000,000 | 3,255,000,000 | 0 | 0 | 2019-09-16 | 2019-09-17 | 2019-10-01 | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 134,215,000 | 3.96 % | Belum dinilai |
104 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan Jalan Tamrin 1 Kel.Mabuun Kec.Murung Pudak | Tender | Pekerjaan Konstruksi | 3006059 | 21825355 | APBD | 350,000,000 | 349,998,696 | 343,057,600 | 343,057,600 | 343,057,000 | 0 | 0 | 0 | 2019-10-10 | 2019-10-23 | 15.129.641.5-735.000 | CV. TANJUNG PUTRA | 6,942,400 | 1.98 % | Belum dinilai | |||
105 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan Jalan Tamrin Kel.Mabuun Kec.Murung Pudak | Tender | Pekerjaan Konstruksi | 3003059 | 21826112 | APBD | 450,000,000 | 449,988,584 | 442,338,908 | 442,338,908 | 442,336,000 | 442,336,000 | 0 | 0 | 2019-10-09 | 2019-10-21 | 2019-10-24 | 01.428.401.2-735.000 | CV.BAHTERA RACHMAN AGUNG | 0014284012735000 | CV.BAHTERA RACHMAN AGUNG | 7,661,092 | 1.7 % | Belum dinilai |
106 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Mangkupum - Jambu Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2778059 | 21778509 | APBD | 1,500,000,000 | 1,499,999,652 | 1,455,185,360 | 1,455,185,360 | 1,455,185,000 | 1,455,185,000 | 0 | 0 | 2019-07-09 | 2019-07-22 | 2019-07-26 | 01.123.972.0-735.000 | CV. ANALIS | 0011239720735000 | CV. ANALIS | 44,814,640 | 2.99 % | Belum dinilai |
107 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review Perencanaan Teknis Pembangunan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2945059 | 21903145 | APBDP | 168,959,687 | 167,915,000 | 167,299,000 | 167,299,000 | 167,299,000 | 167,299,000 | 0 | 0 | 2019-09-23 | 2019-10-24 | 2019-11-07 | 76.278.662.2-732.000 | CV. Mitra Arsindo Consultant | 0762786622732000 | CV. Mitra Arsindo Consultant | 1,660,687 | 0.98 % | Belum dinilai |
108 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Modal Pem. Berkala Jl Mahe-Pujung-Burum Kec. Bintang Ara (DID Infrastruktur)-Pemeliharaan Berkala Jalan Mahe-Pujung-Burum Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2549059 | 21118316 | APBD | 5,887,585,000 | 5,887,035,942 | 5,448,903,200 | 5,448,903,200 | 5,448,903,000 | 5,448,903,000 | 0 | 0 | 2019-05-09 | 2019-05-22 | 2019-05-29 | 02.590.894.8-735.000 | CV. NUR SHIFFA | 0025908948735000 | CV. NUR SHIFFA | 438,681,800 | 7.45 % | Belum dinilai |
109 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Bataman - Fajar Baru Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2822059 | 21819392 | APBD | 600,000,000 | 599,925,763 | 573,048,503 | 573,048,503 | 573,048,000 | 573,048,000 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-13 | 02.590.745.2-735.000 | CV. BANGUN BANUA | 0025907452735000 | CV. BANGUN BANUA | 26,951,497 | 4.49 % | Belum dinilai |
110 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Drainase Jalan Basuki Rahmat - Hikun Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2861059 | 21867065 | APBD | 568,699,150 | 568,318,476 | 545,528,525 | 545,528,525 | 545,528,000 | 545,528,000 | 0 | 0 | 2019-08-12 | 2019-08-21 | 2019-08-27 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 23,170,625 | 4.07 % | Belum dinilai |
111 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Pipa Distribusi Air Minum Kawasan Tanjung Baru (DDUB) | Tender | Pekerjaan Konstruksi | 2627059 | 19453795 | APBD | 2,500,000,000 | 2,499,958,694 | 2,317,266,792 | 2,317,266,792 | 2,317,266,000 | 2,317,266,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-25 | 02.590.469.9-735.000 | Cv wanda | 0025904699735000 | Cv wanda | 182,733,208 | 7.31 % | Belum dinilai |
112 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan dan Pemasangan Line PJU | Tender | Pekerjaan Konstruksi | 2587059 | 20190959 | APBD | 270,000,000 | 269,310,000 | 244,333,100 | 244,333,100 | 244,333,100 | 244,333,100 | 0 | 0 | 2019-05-03 | 2019-05-16 | 2019-05-27 | 82.602.342.6-731.000 | PT. PEMASANGAN BARU DUA SEMBILAN | 82.602.342.6-731.000 | PT. PEMASANGAN BARU DUA SEMBILAN | 25,666,900 | 9.51 % | Belum dinilai |
113 | 2019 | DINAS LINGKUNGAN HIDUP | Pekerjaan Konstruksi Sumur Bor, Pompa Air dan Tempat Cuci Kendaraan TPA Bongkang | Tender | Pekerjaan Konstruksi | 2634059 | 19641128 | APBD | 485,000,000 | 484,999,990 | 468,823,545 | 468,823,545 | 468,823,000 | 468,823,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-28 | 01.214.211.3-732.000 | cv.wasis | 01.214.211.3-732.000 | cv.wasis | 16,176,455 | 3.34 % | Belum dinilai |
114 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Teknis Pengadaan dan Pemasangan Pipa Distribusi IKK Upau Ke arah Desa Masingai I dan II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2448059 | 19455756 | APBD | 294,625,000 | 294,607,500 | 280,005,000 | 280,005,000 | 280,005,000 | 280,005,000 | 0 | 0 | 2019-02-19 | 2019-03-28 | 2019-04-15 | 01.647.863.8-731.000 | CV. Mitra Jasa | 01.647.863.8-731.000 | CV. Mitra Jasa | 14,620,000 | 4.96 % | Belum dinilai |
115 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan dan Pemasangan dan Panel Kontrol | Tender | Pekerjaan Konstruksi | 2595059 | 20190960 | APBD | 420,000,000 | 419,877,000 | 392,986,770 | 392,986,770 | 392,986,770 | 392,986,770 | 0 | 0 | 2019-05-06 | 2019-05-24 | 2019-06-12 | 71.381.268.3-735.000 | CV ORTANG | 71.381.268.3-735.000 | CV ORTANG | 27,013,230 | 6.43 % | Belum dinilai |
116 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Saluran Air Desa Padangin RT.2 Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2865059 | 21516685 | APBD | 759,000,000 | 751,212,846 | 660,000,011 | 657,800,011 | 657,800,011 | 657,800,011 | 0 | 0 | 2019-08-15 | 2019-08-27 | 2019-09-10 | 02.919.299.4-735.000 | CV.SPACE PLAN | 02.919.299.4-735.000 | CV.SPACE PLAN | 98,999,989 | 13.04 % | Belum dinilai |
117 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) | Tender | Pekerjaan Konstruksi | 2762059 | 21745003 | APBD | 5,175,000,000 | 5,174,904,436 | 4,889,114,806 | 4,889,114,806 | 4,887,309,000 | 0 | 0 | 0 | 2019-07-05 | 2019-07-16 | 01.919.004.8-735.000 | CV. EDU RISKA | 285,885,194 | 5.52 % | Belum dinilai | |||
118 | 2019 | DINAS PERIKANAN | Paket Budidaya Patin di Kolam | Tender | Pengadaan Barang | 2642059 | 21658608 | APBD | 386,750,000 | 380,698,500 | 374,795,005 | 374,795,005 | 373,692,000 | 373,692,000 | 0 | 0 | 2019-05-29 | 2019-06-17 | 2019-07-01 | 02.590.608.2-732.000 | CV. MEGA CIPTA SARANA | 02.590.608.2-732.000 | CV. MEGA CIPTA SARANA | 11,954,995 | 3.09 % | Belum dinilai |
119 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Revitalisasi Pasar Mahe Kecamatan Haruai | Tender | Pekerjaan Konstruksi | 2703059 | 21694199 | APBD | 1,333,473,000 | 1,331,087,553 | 1,179,008,101 | 1,179,008,101 | 1,179,008,101 | 1,179,008,101 | 0 | 0 | 2019-06-24 | 2019-07-05 | 2019-07-17 | 83.673.082.0-735.000 | CV. BIMA PERSADA | 0836730820735000 | CV. BIMA PERSADA | 154,464,899 | 11.58 % | Belum dinilai |
120 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Mangkusip - Pamarangan Kec. Tanta | Tender | Pekerjaan Konstruksi | 2776059 | 19663578 | APBD | 1,000,000,000 | 999,573,880 | 984,575,836 | 984,575,836 | 984,575,000 | 984,575,000 | 0 | 0 | 2019-07-10 | 2019-07-19 | 2019-07-25 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 15,424,164 | 1.54 % | Belum dinilai |
121 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Tantaringin - Sp. 3 Padangin Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2799059 | 19674463 | APBD | 950,000,000 | 949,921,120 | 902,500,469 | 902,500,469 | 889,705,000 | 889,705,000 | 0 | 0 | 2019-07-15 | 2019-07-25 | 2019-08-07 | 02.421.698.8-732.000 | CV. PUTRA TUNGGAL ANNOR | 02.421.698.8-732.000 | CV. PUTRA TUNGGAL ANNOR | 47,499,531 | 5 % | Belum dinilai |
122 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Sp. 3 Cenderawasih - Bangun Sari | Tender | Pekerjaan Konstruksi | 2810059 | 19674432 | APBD | 950,000,000 | 941,716,297 | 855,000,760 | 855,000,760 | 855,000,760 | 855,000,700 | 0 | 0 | 2019-07-22 | 2019-07-31 | 2019-08-09 | 81.211.787.7-735.000 | CV. SEMAN SHATI | 81.211.787.7-735.000 | CV. SEMAN SHATI | 94,999,240 | 10 % | Belum dinilai |
123 | 2019 | DINAS PEMBERDAYAAN MASYARAKAT DAN PEMERINTAHAN DESA | Belanja Pakaian Batik Tradisional | Tender | Pengadaan Barang | 2555059 | 21401333 | APBD | 611,600,000 | 611,600,000 | 473,990,000 | 473,990,000 | 382,250,000 | 382,250,000 | 0 | 0 | 2019-04-18 | 2019-05-02 | 2019-05-13 | 31.329.425.8-424.000 | izzata | 31.329.425.8-424.000 | izzata | 137,610,000 | 22.5 % | Belum dinilai |
124 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan kambitin - Wayau (lanjutan) Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2629059 | 19663624 | APBD | 800,000,000 | 793,195,838 | 753,525,049 | 753,525,049 | 753,525,000 | 753,525,000 | 0 | 0 | 2019-05-28 | 2019-06-18 | 2019-06-24 | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 46,474,951 | 5.81 % | Belum dinilai |
125 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan dan Pemasangan SHS PLTS di Desa Panaan RT 3 Kp Kuari sebanyak 45 Unit | Tender | Jasa Lainnya | 2924059 | 21926584 | APBDP | 422,495,000 | 405,469,350 | 405,126,700 | 405,126,700 | 405,126,700 | 405,126,700 | 0 | 0 | 2019-09-12 | 2019-09-24 | 2019-09-30 | 02.918.066.8-733.000 | CV. CAESSAR | 02.918.066.8-733.000 | CV. CAESSAR | 17,368,300 | 4.11 % | Belum dinilai |
126 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Modal Pem. Berkala Jl Banua Rantau-Habau Kec. Bn. Lawas (DID Kesejahteraan)-Pemeliharaan Berkala Jalan Banua Rantau-Habau Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2557059 | 21124691 | APBD | 2,391,345,000 | 2,391,335,085 | 2,342,977,517 | 2,341,333,017 | 2,341,000,000 | 2,341,000,000 | 0 | 0 | 2019-05-02 | 2019-05-14 | 2019-05-23 | 01.124.248.4-735.000 | CV. SETIA WARGA | 01.124.248.4-735.000 | CV. SETIA WARGA | 48,367,483 | 2.02 % | Belum dinilai |
127 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Siring Murung Mahang Desa Jirak RT.3 Kec. Pugaan | Tender | Pekerjaan Konstruksi | 2814059 | 21670400 | APBD | 634,800,000 | 631,515,601 | 594,986,903 | 594,875,187 | 589,112,000 | 0 | 0 | 0 | 2019-07-26 | 2019-08-06 | 02.919.453.7-735.000 | cv rodhita | 39,813,097 | 6.27 % | Belum dinilai | |||
128 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Suput - Kambitin Kec. Haruai | Tender | Pekerjaan Konstruksi | 2768059 | 19674818 | APBD | 1,357,340,000 | 1,357,312,785 | 1,289,045,703 | 1,289,045,703 | 1,289,045,000 | 1,289,045,000 | 0 | 0 | 2019-07-09 | 2019-07-19 | 2019-07-24 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 68,294,297 | 5.03 % | Belum dinilai |
129 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jalan Usaha Tani D.I.R Banua Lawas Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2827059 | 21516655 | APBD | 485,760,000 | 481,526,652 | 467,511,699 | 467,511,699 | 467,511,000 | 467,511,000 | 0 | 0 | 2019-07-29 | 2019-08-08 | 2019-08-13 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 18,248,301 | 3.76 % | Belum dinilai |
130 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Tanjung Luar Kota | Tender | Jasa Lainnya | 2490059 | 20190963 | APBD | 233,870,900 | 225,200,027 | 217,620,975 | 217,620,975 | 217,427,375 | 217,427,375 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 16,249,925 | 6.95 % | Belum dinilai |
131 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Istana Al Faza Mabuun | Tender | Pekerjaan Konstruksi | 3033059 | 21887371 | APBD | 385,347,000 | 385,344,688 | 381,302,382 | 381,302,382 | 381,300,000 | 381,300,000 | 0 | 0 | 2019-10-16 | 2019-10-24 | 2019-10-29 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 4,044,618 | 1.05 % | Belum dinilai |
132 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Saluran Drainase/Gorong-gorong Jalan Sp. 3 Pembataan - Komperta Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2863059 | 21867021 | APBD | 861,365,000 | 861,364,643 | 847,178,709 | 847,178,709 | 847,177,000 | 847,177,000 | 0 | 0 | 2019-08-12 | 2019-08-22 | 2019-08-27 | 31.669.359.7-735.000 | CV.WARDHANA | 0316693597735000 | CV.WARDHANA | 14,186,291 | 1.65 % | Belum dinilai |
133 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengaspalan Jalan Reformasi Kasiau Raya | Tender | Pekerjaan Konstruksi | 2994059 | 21826223 | APBD | 454,975,000 | 454,591,546 | 447,463,353 | 447,463,353 | 447,463,000 | 447,463,000 | 0 | 0 | 2019-10-03 | 2019-10-14 | 2019-10-18 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 7,511,647 | 1.65 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Pelita | Tender | Pekerjaan Konstruksi | 2993059 | 21885101 | APBD | 513,300,000 | 497,487,373 | 480,514,691 | 480,514,691 | 470,700,000 | 470,700,000 | 0 | 0 | 2019-10-02 | 2019-10-12 | 2019-10-17 | 01.249.085.0-735.000 | CV. SUMBER REZEKI | 01.249.085.0-735.000 | CV. SUMBER REZEKI | 32,785,309 | 6.39 % | Belum dinilai |
2 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Griya Eka Paksi (Lanjutan) | Tender | Pekerjaan Konstruksi | 3028059 | 21884996 | APBD | 335,348,000 | 335,330,389 | 332,774,124 | 332,774,124 | 332,774,000 | 332,774,000 | 0 | 0 | 2019-10-14 | 2019-10-22 | 2019-10-25 | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 2,573,876 | 0.77 % | Belum dinilai |
3 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pembuatan Ruangan Gedung Kantor | Tender | Pekerjaan Konstruksi | 3023059 | 21906807 | APBD | 506,025,000 | 494,834,552 | 479,308,927 | 479,308,927 | 479,308,927 | 479,308,927 | 0 | 0 | 2019-10-14 | 2019-10-23 | 2019-10-31 | 02.919.275.4-735.000 | CV.INDAH PERDANA | 02.919.275.4-735.000 | CV.INDAH PERDANA | 26,716,073 | 5.28 % | Belum dinilai |
4 | 2019 | DINAS KESEHATAN | Instalasi Pengelolaan Limbah (IPAL) Puskesmas | Tender | Pengadaan Barang | 3018059 | 22142685 | APBD | 1,678,385,000 | 1,617,400,000 | 1,612,000,500 | 1,612,000,500 | 1,612,000,500 | 1,612,000,500 | 0 | 0 | 2019-10-11 | 2019-10-22 | 2019-10-30 | 01.355.627.9-013.000 | CV. RIAPRIMA PUTRI AMBAR | 01.355.627.9-013.000 | CV. RIAPRIMA PUTRI AMBAR | 66,384,500 | 3.96 % | Belum dinilai |
5 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Peningkatan Jalan Lingkungan Pasar Mabuun Tembus Muka Wira Toyota | Tender | Pekerjaan Konstruksi | 2985059 | 22131352 | APBD | 544,765,000 | 544,759,775 | 539,300,788 | 539,300,788 | 539,299,000 | 539,299,000 | 0 | 0 | 2019-10-03 | 2019-10-14 | 2019-10-18 | 02.919.208.5-735.000 | CV.BANGUN BANUA | 0029192085735000 | CV.BANGUN BANUA | 5,464,212 | 1 % | Belum dinilai |
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Pintu Air Desa Harus Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2811059 | 21740657 | APBD | 460,000,000 | 458,857,188 | 450,893,468 | 450,893,468 | 450,893,000 | 0 | 0 | 0 | 2019-07-29 | 2019-08-07 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 9,106,532 | 1.98 % | Belum dinilai | |||
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Tribun Tempat Duduk Stadion Mini Andalas Nawin Kec.Haruai | Tender | Pekerjaan Konstruksi | 2760059 | 19458485 | APBD | 2,766,602,000 | 2,766,230,000 | 2,705,378,632 | 2,705,378,632 | 2,705,378,000 | 2,705,378,000 | 0 | 0 | 2019-07-05 | 2019-07-16 | 2019-07-22 | 86.336.554.0-735.000 | PT. RIFQI MULIA JAYA | 86.336.554.0-735.000 | PT. RIFQI MULIA JAYA | 61,223,368 | 2.21 % | Belum dinilai |
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan DAM Irigasi Desa Kambitin Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2803059 | 21740668 | APBD | 460,000,000 | 459,090,392 | 429,181,742 | 429,181,742 | 381,878,481 | 0 | 0 | 0 | 2019-07-29 | 2019-08-08 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 30,818,258 | 6.7 % | Belum dinilai | |||
9 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Muara Uya | Tender | Jasa Lainnya | 2487059 | 20190968 | APBD | 345,395,600 | 325,494,724 | 308,418,600 | 308,418,600 | 292,834,400 | 292,834,400 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 36,977,000 | 10.71 % | Belum dinilai |
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Tanggul & Pintu Air Desa Pampanan RT.03 Kec. Pugaan dan Pembuatan Pintu Air Di Sungai Tingang Desa Jirak RT.03 Kec. Pugaan | Tender | Pekerjaan Konstruksi | 2813059 | 21740674 | APBD | 1,012,000,000 | 1,008,726,303 | 968,132,635 | 968,132,635 | 965,700,000 | 965,700,000 | 0 | 0 | 2019-07-30 | 2019-08-08 | 2019-08-13 | 02.746.710.9-735.000 | CV.GALANG AMANDIT UTAMA | 02.746.710.9-735.000 | CV.GALANG AMANDIT UTAMA | 43,867,365 | 4.33 % | Belum dinilai |
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Sp.3 Kalingai - Rungun Kec. Bintang Ara, Peningkatan Jalan Rungun - Misim Kec. Bintang Ara dan Peningkatan Jalan Bina Desa Jembatan Sakuyah Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2868059 | 21882137 | APBD | 6,750,000,000 | 6,749,971,911 | 6,611,976,689 | 6,611,976,689 | 6,610,986,000 | 6,610,986,000 | 0 | 0 | 2019-08-13 | 2019-08-23 | 2019-09-04 | 02.475.260.2-735.000 | CV. NAILA RIZKY | 0024752602735000 | CV. NAILA RIZKY | 138,023,311 | 2.04 % | Belum dinilai |
12 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Siring Dan Urugan Desa Tamunti RT.03 Kec. Pugaan | Tender | Pekerjaan Konstruksi | 2815059 | 21753014 | APBD | 634,800,000 | 631,361,126 | 616,774,314 | 616,774,314 | 614,928,000 | 614,928,000 | 0 | 0 | 2019-07-30 | 2019-08-08 | 2019-08-13 | 01.124.250.0-735.000 | CV. Sinar Baru | 01.124.250.0-735.000 | CV. Sinar Baru | 18,025,686 | 2.84 % | Belum dinilai |
13 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Pondok Karet Permai | Tender | Pekerjaan Konstruksi | 3005059 | 21884695 | APBD | 500,000,000 | 499,973,756 | 490,218,944 | 490,218,944 | 490,218,000 | 490,218,000 | 0 | 0 | 2019-10-09 | 2019-10-21 | 2019-10-25 | 02.590.435.0-735.000 | CV. ANDIN WIRANDY | 0025904350735000 | CV. ANDIN WIRANDY | 9,781,056 | 1.96 % | Belum dinilai |
14 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Siring Jalan/Tanggul D.I.R Tamunti | Tender | Pekerjaan Konstruksi | 2812059 | 21670434 | APBD | 459,172,000 | 455,014,892 | 442,406,725 | 442,406,725 | 442,400,000 | 442,400,000 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-12 | 02.089.920.9-735.000 | CV. PUTRA SABAKA | 02.089.920.9-735.000 | CV. PUTRA SABAKA | 16,765,275 | 3.65 % | Belum dinilai |
15 | 2019 | DINAS LINGKUNGAN HIDUP | Pembangunan Kontruksi Kantor Pengelola TPA Bongkang | Tender | Pekerjaan Konstruksi | 2598059 | 19641151 | APBD | 540,000,000 | 539,997,605 | 529,877,073 | 529,877,073 | 529,877,000 | 529,877,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-28 | 02.590.469.9-735.000 | Cv wanda | 0025904699735000 | Cv wanda | 10,122,927 | 1.87 % | Belum dinilai |
16 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Desa Harus Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2678059 | 21663574 | APBD | 1,026,760,000 | 1,026,758,901 | 1,000,000,000 | 1,000,000,000 | 1,000,000,000 | 1,000,000,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 26,760,000 | 2.61 % | Belum dinilai |
17 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Box Culvert Desa Kasiau Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2566059 | 21119982 | APBD | 400,000,000 | 399,999,187 | 389,144,238 | 386,944,238 | 386,944,000 | 386,944,000 | 0 | 0 | 2019-05-09 | 2019-05-20 | 2019-05-29 | 02.590.467.3-735.000 | CV. MENTARI | 0025904673735000 | CV. MENTARI | 10,855,762 | 2.71 % | Belum dinilai |
18 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas Jalan Barimbun - Sp.3 Mungkur Palawan (Ruas 95) Kec. Tanta spj 1,427 km (DAK Bidang Jalan) | Tender | Pekerjaan Konstruksi | 2626059 | 21375100 | APBD | 2,702,490,000 | 2,702,395,652 | 2,641,473,668 | 2,641,473,668 | 2,640,000,000 | 2,640,000,000 | 0 | 0 | 2019-06-10 | 2019-06-18 | 2019-06-24 | 02.050.793.5-735.000 | CV. SAILA RIZKY | 0020507935735000 | CV. SAILA RIZKY | 61,016,332 | 2.26 % | Belum dinilai |
19 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Gantung Desa Hapalah Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2637059 | 19655062 | APBD | 2,000,000,000 | 1,999,954,766 | 1,958,675,281 | 1,958,675,281 | 1,958,675,000 | 1,958,675,000 | 0 | 0 | 2019-06-10 | 2019-06-20 | 2019-06-26 | 02.172.438.0-735.000 | CV. BATUAH | 02.172.438.0-735.000 | CV. BATUAH | 41,324,719 | 2.07 % | Belum dinilai |
20 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Komplek Stadion - Sp. 3 Majumbi Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2565059 | 19674369 | APBD | 950,000,000 | 869,348,302 | 823,138,729 | 823,138,729 | 823,138,000 | 823,138,000 | 0 | 0 | 2019-05-06 | 2019-05-20 | 2019-05-29 | 31.669.359.7-735.000 | CV.WARDHANA | 0316693597735000 | CV.WARDHANA | 126,861,271 | 13.35 % | Belum dinilai |
21 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Murung Karangan Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2677059 | 21663586 | APBD | 440,040,000 | 435,638,566 | 423,151,590 | 423,151,590 | 423,150,000 | 423,150,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.421.948.7-735.000 | CV. WINDA PRATAMA | 0024219487735000 | CV. WINDA PRATAMA | 16,888,410 | 3.84 % | Belum dinilai |
22 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal peninggian Jalan Pasar kelua | Tender | Pekerjaan Konstruksi | 2630059 | 19825667 | APBD | 1,284,141,000 | 1,282,273,000 | 1,241,208,500 | 1,241,208,500 | 1,241,208,000 | 1,241,208,000 | 0 | 0 | 2019-05-29 | 2019-06-17 | 2019-06-27 | 02.919.164.0-735.000 | CV. BANGUN KARYA KONSTRUKSI | 0029191640735000 | CV. BANGUN KARYA KONSTRUKSI | 42,932,500 | 3.34 % | Belum dinilai |
23 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Kelahang Regency | Tender | Pekerjaan Konstruksi | 3027059 | 21884760 | APBD | 500,000,000 | 499,983,583 | 468,500,473 | 468,500,473 | 468,500,473 | 468,500,473 | 0 | 0 | 2019-10-16 | 2019-10-29 | 2019-11-06 | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 31,499,527 | 6.3 % | Belum dinilai |
24 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Padang Lumbu - Batas Kalteng Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2763059 | 19674336 | APBD | 950,000,000 | 949,999,815 | 912,004,143 | 912,004,143 | 904,970,000 | 904,970,000 | 0 | 0 | 2019-07-09 | 2019-07-19 | 2019-07-24 | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 37,995,857 | 4 % | Belum dinilai |
25 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Haruai - Sp. 3 Hayup Kec. Haruai | Tender | Pekerjaan Konstruksi | 2689059 | 19674778 | APBD | 2,863,675,000 | 2,863,665,160 | 2,700,804,470 | 2,700,804,470 | 2,679,675,000 | 2,679,675,000 | 0 | 0 | 2019-06-19 | 2019-07-01 | 2019-07-08 | 83.684.580.0-735.000 | CV. MAHKOTA PUTRI MANDIRI | 0836845800735000 | CV. MAHKOTA PUTRI MANDIRI | 162,870,530 | 5.69 % | Belum dinilai |
26 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Upgrating IPA SPAM Kapasitas 10 liter/detik,Ds.Warukin Kec.Tanta (DAK Bidang Air Minum) | Tender | Pekerjaan Konstruksi | 2619059 | 21520267 | APBD | 3,300,968,000 | 3,300,959,260 | 3,120,461,625 | 3,120,461,625 | 3,120,461,625 | 3,120,461,624 | 0 | 0 | 2019-05-23 | 2019-06-12 | 2019-06-25 | 01.261.321.2-735.000 | PT. SIAM KARYA HUSNA | 01.261.321.2-735.000 | PT. SIAM KARYA HUSNA | 180,506,375 | 5.47 % | Belum dinilai |
27 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Siring Saluran Pembuang Kaong Kec. Upau | Tender | Pekerjaan Konstruksi | 2679059 | 21663554 | APBD | 466,440,000 | 459,446,990 | 445,732,912 | 445,732,912 | 445,727,000 | 445,727,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.919.023.8-735.000 | CV. BAHUNGIN RAYA | 0029190238735000 | CV. BAHUNGIN RAYA | 20,707,088 | 4.44 % | Belum dinilai |
28 | 2019 | DINAS KESEHATAN | Pembangunan Baru Poskesdes Binturu Kecamatan Kelua | Tender | Pekerjaan Konstruksi | 2854059 | 21766833 | APBD | 331,000,000 | 330,610,000 | 313,989,453 | 313,989,453 | 313,967,000 | 313,967,000 | 0 | 0 | 2019-08-15 | 2019-08-26 | 2019-09-02 | 02.172.434.9-735.000 | CV. LANAGIA & Co | 0021724349735000 | CV. LANAGIA & Co | 17,010,547 | 5.14 % | Belum dinilai |
29 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Komplek Flamboyan Asri dan Penanganan PSU Perumahan Anggrek | Tender | Pekerjaan Konstruksi | 3055059 | 22300826 | APBDP | 1,438,791,000 | 1,434,326,473 | 1,405,652,603 | 1,405,652,603 | 1,405,644,000 | 1,405,644,000 | 0 | 0 | 2019-10-22 | 2019-11-02 | 2019-11-05 | 02.019.122.7-735.000 | CV. MANDIRI | 02.019.122.7-735.000 | CV. MANDIRI | 33,138,397 | 2.3 % | Belum dinilai |
30 | 2019 | DINAS PERTANIAN | Pembangunan Gudang Alat dan Mesin Pertanian pada UPT Balai Alsintan | Tender | Pekerjaan Konstruksi | 2984059 | 22058212 | APBDP | 276,195,000 | 276,140,378 | 256,874,176 | 256,874,176 | 256,874,000 | 256,874,000 | 0 | 0 | 2019-09-30 | 2019-10-10 | 2019-10-17 | 02.746.617.6-735.000 | CV VIA TANJUNG LESTARI | 0027466176735000 | CV VIA TANJUNG LESTARI | 19,320,824 | 7 % | Belum dinilai |
31 | 2019 | DINAS KESEHATAN | relokasi poskesdes pasar panas kecamatan kelua | Tender | Pekerjaan Konstruksi | 2853059 | 21766835 | APBD | 417,341,700 | 380,770,000 | 362,014,298 | 362,014,298 | 362,014,000 | 362,014,000 | 0 | 0 | 2019-08-16 | 2019-08-28 | 2019-09-05 | 83.684.580.0-735.000 | CV. MAHKOTA PUTRI MANDIRI | 0836845800735000 | CV. MAHKOTA PUTRI MANDIRI | 55,327,402 | 13.26 % | Belum dinilai |
32 | 2019 | DINAS PERTANIAN | Konstruksi Pembangunan Gudang UPPB di Kecamatan Tanta | Tender | Pekerjaan Konstruksi | 2892059 | 20330478;21969506 | APBD | 801,396,000 | 400,500,254 | 390,174,630 | 390,174,630 | 390,174,000 | 390,174,000 | 0 | 0 | 2019-09-10 | 2019-09-19 | 2019-09-25 | 02.019.129.2-735.000 | CV. RELA BANGUN TATA PERSADA | 02.019.129.2-735.000 | CV. RELA BANGUN TATA PERSADA | 411,221,370 | 51.31 % | Belum dinilai |
33 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Gantung Desa Pangkalan Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2567059 | 19655065 | APBD | 7,985,648,300 | 7,985,468,343 | 7,556,929,660 | 7,556,929,660 | 7,556,929,000 | 7,556,929,000 | 0 | 0 | 2019-05-15 | 2019-05-27 | 2019-06-11 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 428,718,640 | 5.37 % | Belum dinilai |
34 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Permata Hijau | Tender | Pekerjaan Konstruksi | 3051059 | 22021959 | APBDP | 235,000,000 | 229,989,001 | 223,045,410 | 223,045,410 | 223,045,000 | 223,045,000 | 0 | 0 | 2019-10-21 | 2019-10-29 | 2019-11-05 | 70.186.362.3-735.000 | CV. JADI REZEKI BERSAMA | 70.186.362.3-735.000 | CV. JADI REZEKI BERSAMA | 11,954,590 | 5.09 % | Belum dinilai |
35 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Hapalah Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2673059 | 21663601 | APBD | 528,000,000 | 525,307,012 | 514,355,973 | 514,355,973 | 514,355,000 | 514,355,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.590.745.2-735.000 | CV. BANGUN BANUA | 0025907452735000 | CV. BANGUN BANUA | 13,644,027 | 2.58 % | Belum dinilai |
36 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jaringan Irigasi Pamarangan Kiwa Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2672059 | 21663502 | APBD | 1,039,640,000 | 1,039,633,495 | 987,651,390 | 987,651,390 | 987,651,000 | 987,651,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-03 | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 51,988,610 | 5 % | Belum dinilai |
37 | 2019 | DINAS PENDIDIKAN | Lanjutan Pembangunan Kampung Budaya | Tender | Pekerjaan Konstruksi | 2968059 | 21959149 | APBD | 230,223,700 | 229,124,000 | 216,941,285 | 216,941,285 | 207,294,000 | 207,294,000 | 0 | 0 | 2019-09-23 | 2019-10-02 | 2019-10-08 | 02.172.434.9-735.000 | CV. LANAGIA & Co | 0021724349735000 | CV. LANAGIA & Co | 13,282,415 | 5.77 % | Belum dinilai |
38 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Sei. Durian - Tabur Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2647059 | 19663652 | APBD | 2,263,700,000 | 2,262,550,000 | 2,205,823,805 | 2,205,823,805 | 2,205,823,000 | 2,205,823,000 | 0 | 0 | 2019-06-10 | 2019-06-20 | 2019-06-25 | 01.249.113.0-731.000 | CV. Prestasi Utama | 0012491130731000 | CV. Prestasi Utama | 57,876,195 | 2.56 % | Belum dinilai |
39 | 2019 | PDAM Kabupaten Tabalong | Pembangunan IPA kapasitas 50 Liter/detik, rehab rumah jaga operator menjadi bengkel meter dan gedung laboratorium. | Tender | Pekerjaan Konstruksi | 2561059 | 21367374 | BUMD | 7,260,000,000 | 6,679,379,107 | 6,288,570,884 | 6,288,570,884 | 6,288,570,884 | 6,288,570,000 | 0 | 0 | 2019-08-08 | 2019-08-21 | 2019-09-13 | 01.585.283.3-731.000 | CV.BRAMA JR | 01.585.283.3-731.000 | CV.BRAMA JR | 971,429,116 | 13.38 % | Belum dinilai |
40 | 2019 | DINAS PERIKANAN | Pengadaan Peralatan Perikanan Tangkap (DAK Fisik) | Tender | Pengadaan Barang | 2645059 | 21660413 | APBD | 726,225,000 | 726,225,000 | 696,900,000 | 696,900,000 | 696,900,000 | 696,900,000 | 0 | 0 | 2019-06-10 | 2019-06-21 | 2019-07-08 | 02.533.874.0-714.000 | CV.KRINA | 02.533.874.0-714.000 | CV.KRINA | 29,325,000 | 4.04 % | Belum dinilai |
41 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Haruai | Tender | Jasa Lainnya | 2486059 | 20190961 | APBD | 401,645,090 | 375,350,434 | 355,239,900 | 355,239,900 | 336,569,900 | 336,569,900 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 02.919.412.3-735.000 | CV. PRAMUDIA ELEKTRIKAL | 46,405,190 | 11.55 % | Belum dinilai |
42 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Loyang Indah | Tender | Pekerjaan Konstruksi | 3045059 | 21977101 | APBDP | 500,000,000 | 499,460,301 | 482,512,635 | 482,512,635 | 482,512,000 | 482,512,000 | 0 | 0 | 2019-10-21 | 2019-10-30 | 2019-11-06 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 17,487,365 | 3.5 % | Belum dinilai |
43 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Citra Hutama Mabuun | Tender | Pekerjaan Konstruksi | 2930059 | 21839969 | APBD | 500,000,000 | 499,999,844 | 496,740,746 | 496,740,746 | 496,740,000 | 496,740,000 | 0 | 0 | 2019-09-16 | 2019-09-25 | 2019-10-02 | 91.095.112.8-735.000 | CV AR-RAHIM | 0910951128735000 | CV AR-RAHIM | 3,259,254 | 0.65 % | Belum dinilai |
44 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Gantung Desa Burum Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2631059 | 19655059 | APBD | 3,000,000,000 | 2,999,885,321 | 2,911,042,236 | 2,911,042,236 | 2,911,042,236 | 2,911,042,236 | 0 | 0 | 2019-06-10 | 2019-06-18 | 2019-07-02 | 01.203.944.2-732.000 | CV. Sari Alam Utama | 01.203.944.2-732.000 | CV. Sari Alam Utama | 88,957,764 | 2.97 % | Belum dinilai |
45 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Revitalisasi Pasar Wayau Kecamatan Tanjung | Tender | Pekerjaan Konstruksi | 2697059 | 21694219 | APBD | 1,642,616,000 | 1,641,081,283 | 1,542,445,169 | 1,542,445,169 | 1,542,445,169 | 1,624,839,396 | 0 | 0 | 2019-06-21 | 2019-07-03 | 2019-07-19 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 81.211.787.7-735.000 | CV. SEMAN SHATI | 100,170,831 | 6.1 % | Belum dinilai |
46 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Komp. Sulingan Indah Permata | Tender | Pekerjaan Konstruksi | 3047059 | 21872489 | APBD | 500,000,000 | 494,446,801 | 454,385,266 | 454,385,266 | 454,385,000 | 454,385,000 | 0 | 0 | 2019-10-21 | 2019-10-29 | 2019-11-05 | 91.095.112.8-735.000 | CV AR-RAHIM | 0910951128735000 | CV AR-RAHIM | 45,614,734 | 9.12 % | Belum dinilai |
47 | 2019 | BADAN PENANGGULANGAN BENCANA DAERAH | Pembuatan tempat Parkir Mobil dan Kantor TRC Tingkat 2 (6x12 M2) | Tender | Pekerjaan Konstruksi | 2841059 | 21785588 | APBD | 313,515,000 | 313,508,573 | 303,990,696 | 303,990,696 | 303,990,696 | 303,990,696 | 0 | 0 | 2019-08-01 | 2019-08-14 | 2019-10-22 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 9,524,304 | 3.04 % | Belum dinilai |
48 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Peningkatan jalan kampung Durian Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 3024059 | 21966185 | APBDP | 459,975,000 | 454,650,107 | 441,000,777 | 441,000,777 | 441,000,000 | 441,000,000 | 0 | 0 | 2019-10-11 | 2019-10-21 | 2019-10-24 | 02.919.164.0-735.000 | CV. BANGUN KARYA KONSTRUKSI | 0029191640735000 | CV. BANGUN KARYA KONSTRUKSI | 18,974,223 | 4.13 % | Belum dinilai |
49 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Struktur Jalan Kambitin-Pangi (Ruas 109) Kec. Tanjung spj. 4,800 km (DAK Bidang Jalan) dan Pemeliharaan Berkala Jalan Kambitin - Pangi Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2633059 | 21566562 | APBD | 8,170,848,000 | 8,170,613,370 | 7,680,500,326 | 7,680,500,326 | 7,612,241,000 | 7,612,241,000 | 0 | 0 | 2019-06-10 | 2019-06-18 | 2019-06-27 | 02.675.210.5-735.000 | cv.sumber karya mulia | 02.675.210.5-735.000 | cv.sumber karya mulia | 490,347,674 | 6 % | Belum dinilai |
50 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Irigasi Desa Madang Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2669059 | 21663611 | APBD | 434,814,000 | 430,380,273 | 425,226,447 | 425,226,447 | 425,226,000 | 425,226,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 9,587,553 | 2.2 % | Belum dinilai |
51 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Girder Desa Burum Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2828059 | 21815663 | APBD | 2,250,000,000 | 2,249,403,580 | 2,200,839,394 | 2,200,839,394 | 2,199,127,400 | 2,199,127,400 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-12 | 73.589.728.2-731.000 | CV.PEILANI PUTRA | 73.589.728.2-731.000 | CV.PEILANI PUTRA | 49,160,606 | 2.18 % | Belum dinilai |
52 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Banua Lawas | Tender | Jasa Lainnya | 2489059 | 20190971 | APBD | 273,713,513 | 262,869,512 | 242,951,750 | 242,951,750 | 242,951,750 | 242,951,750 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 01.124.213.8-735.000 | CV.BERKAT KAWAN | 0011242138735000 | CV.BERKAT KAWAN | 30,761,763 | 11.24 % | Belum dinilai |
53 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Saluran Air Desa Nawin Kec. Haruai | Tender | Pekerjaan Konstruksi | 2829059 | 21516687 | APBD | 690,000,000 | 689,003,925 | 668,149,395 | 668,149,395 | 668,149,000 | 668,149,000 | 0 | 0 | 2019-07-31 | 2019-08-09 | 2019-08-26 | 71.710.772.6-735.000 | CV.cipta banua | 0717107726735000 | CV.cipta banua | 21,850,605 | 3.17 % | Belum dinilai |
54 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal Rehab Kantin Beras Pasar Kelua | Tender | Pekerjaan Konstruksi | 2612059 | 19825645 | APBD | 398,200,000 | 398,198,000 | 384,055,369 | 384,055,369 | 330,377,679 | 330,377,679 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-25 | 81.093.382.0-735.000 | CV. JASA BERSAMA | 0810933820735000 | CV. JASA BERSAMA | 14,144,631 | 3.55 % | Belum dinilai |
55 | 2019 | DINAS KESEHATAN | Pembangunan Baru Poskesdes Sungai Anyar Kecamatan Banua Lawas | Tender | Pekerjaan Konstruksi | 2876059 | 21766817 | APBD | 350,000,000 | 349,450,000 | 338,928,029 | 338,928,029 | 338,928,000 | 338,928,000 | 0 | 0 | 2019-08-16 | 2019-08-27 | 2019-09-05 | 82.869.563.5-735.000 | CV. HIKMAH RIDHO | 0828695635735000 | CV. HIKMAH RIDHO | 11,071,971 | 3.16 % | Belum dinilai |
56 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan Tiang Lampu PJU | Tender | Pengadaan Barang | 2605059 | 20190952 | APBD | 500,000,000 | 330,620,400 | 305,000,000 | 305,000,000 | 305,000,000 | 305,000,000 | 0 | 0 | 2019-05-23 | 2019-06-12 | 2019-06-26 | 01.124.213.8-735.000 | CV.BERKAT KAWAN | 0011242138735000 | CV.BERKAT KAWAN | 195,000,000 | 39 % | Belum dinilai |
57 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Komp. Citra Plambon Raya | Tender | Pekerjaan Konstruksi | 2928059 | 21884565 | APBD | 500,000,000 | 494,274,841 | 489,887,893 | 489,887,893 | 489,887,000 | 489,887,000 | 0 | 0 | 2019-09-10 | 2019-09-19 | 2019-09-30 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 10,112,107 | 2.02 % | Belum dinilai |
58 | 2019 | SEKRETARIAT DPRD | Belanja Makan Minum Rapat | Tender | Jasa Lainnya | 2513059 | 20959083 | APBD | 875,815,000 | 652,915,000 | 522,482,250 | 522,482,250 | 522,482,250 | 522,482,250 | 0 | 0 | 2019-03-26 | 2019-04-08 | 2019-04-16 | 02.421.948.7-735.000 | CV. WINDA PRATAMA | 0024219487735000 | CV. WINDA PRATAMA | 353,332,750 | 40.34 % | Belum dinilai |
59 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Lanjutan penanganan jalan di desa Hayup Kec. Haruai | Tender | Pekerjaan Konstruksi | 2998059 | 21966015 | APBD | 1,500,000,000 | 1,499,986,273 | 1,450,645,611 | 1,450,645,611 | 1,450,535,000 | 1,450,535,000 | 0 | 0 | 2019-10-03 | 2019-10-14 | 2019-10-18 | 01.585.142.1-735.000 | CV. PATRA JASA UTAMA | 0015851421735000 | CV. PATRA JASA UTAMA | 49,354,389 | 3.29 % | Belum dinilai |
60 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Pipa Distribusi IKK Upau Ke arah Desa Masingai I dan II | Tender | Pekerjaan Konstruksi | 2795059 | 21744976 | APBD | 5,430,177,600 | 5,430,139,114 | 5,268,233,737 | 5,268,233,737 | 5,268,000,000 | 5,268,000,000 | 0 | 0 | 2019-07-15 | 2019-07-25 | 2019-07-30 | 02.590.746.0-735.000 | CV.Firza Pratama | 02.590.746.0-735.000 | CV.Firza Pratama | 161,943,863 | 2.98 % | Belum dinilai |
61 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal Pembangunan Los Pasar Panas | Tender | Pekerjaan Konstruksi | 2710059 | 21697198 | APBD | 1,495,500,000 | 1,494,840,523 | 1,484,857,977 | 1,484,857,977 | 1,484,857,977 | 0 | 0 | 0 | 2019-07-01 | 2019-07-31 | 02.242.745.4-735.000 | CV. SAWARGA SURYA SAKTI | 10,642,023 | 0.71 % | Belum dinilai | |||
62 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Belanja Modal Pembangunan Los Pasar Panas | Tender | Pekerjaan Konstruksi | 2710059 | 21697198 | APBD | 1,495,500,000 | 1,494,840,523 | 0 | 0 | 0 | 0 | 0 | 0 | 2019-07-01 | 2019-07-31 | 75.321.613.4-735.000 | CV. JAWAHIR PRATAMA | 1,495,500,000 | 100 % | Belum dinilai | |||
63 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Samping SPBU Maburai | Tender | Pekerjaan Konstruksi | 3054059 | 21885049 | APBD | 330,347,000 | 325,679,635 | 314,346,773 | 314,346,773 | 314,346,000 | 314,346,000 | 0 | 0 | 2019-10-21 | 2019-10-29 | 2019-11-06 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 16,000,227 | 4.84 % | Belum dinilai |
64 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Kapasitas WTP Belimbing 100 lt/detik Kecamatan Murung Pudak | Tender | Pekerjaan Konstruksi | 2628059 | 21642965 | APBD | 7,942,780,000 | 7,942,437,698 | 7,623,571,074 | 7,623,571,074 | 7,623,571,074 | 7,623,571,000 | 0 | 0 | 2019-05-28 | 2019-06-18 | 2019-06-28 | 01.740.955.8-735.000 | PT. PUSPA HAYUDY HARJO | 0017409558735000 | PT. PUSPA HAYUDY HARJO | 319,208,926 | 4.02 % | Belum dinilai |
65 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 3025059 | 22158376 | APBD | 2,000,000,000 | 1,999,703,630 | 1,981,904,632 | 1,981,904,632 | 1,981,904,632 | 1,981,904,000 | 0 | 0 | 2019-10-16 | 2019-10-25 | 2019-11-07 | 91.095.112.8-735.000 | CV AR-RAHIM | 0910951128735000 | CV AR-RAHIM | 18,095,368 | 0.9 % | Belum dinilai |
66 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Siring Tanggul Dan Penimbunan Tanah Urug Desa Banua Lawas Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2826059 | 21753032 | APBD | 634,800,000 | 628,452,000 | 620,013,689 | 620,013,689 | 620,012,000 | 620,012,000 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-12 | 75.429.962.6-735.000 | CV.INARA | 75.429.962.6-735.000 | CV.INARA | 14,786,311 | 2.33 % | Belum dinilai |
67 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Kelua | Tender | Jasa Lainnya | 2484059 | 20190974 | APBD | 379,528,750 | 369,525,700 | 332,054,450 | 332,054,450 | 332,054,450 | 332,054,450 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 01.124.213.8-735.000 | CV.BERKAT KAWAN | 0011242138735000 | CV.BERKAT KAWAN | 47,474,300 | 12.51 % | Belum dinilai |
68 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kuari - Mihol Kec. Bintang Ara dan Peningkatan Jalan Burum - Sp.3 Mihol Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2869059 | 21882158 | APBD | 7,674,808,050 | 7,674,785,335 | 7,397,638,346 | 7,397,638,346 | 7,397,638,000 | 7,397,638,000 | 0 | 0 | 2019-08-12 | 2019-08-23 | 2019-09-04 | 02.590.894.8-735.000 | CV. NUR SHIFFA | 0025908948735000 | CV. NUR SHIFFA | 277,169,704 | 3.61 % | Belum dinilai |
69 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Saluran Air Luk Bayur dan Irigasi Sekunder Kec. Tanta | Tender | Pekerjaan Konstruksi | 2670059 | 21663568 | APBD | 1,214,400,000 | 1,208,937,319 | 1,141,497,073 | 1,141,497,073 | 1,141,497,000 | 1,141,497,000 | 0 | 0 | 2019-06-14 | 2019-06-24 | 2019-07-01 | 02.590.894.8-735.000 | CV. NUR SHIFFA | 0025908948735000 | CV. NUR SHIFFA | 72,902,927 | 6 % | Belum dinilai |
70 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Lanjutan penanganan jalan di desa Ribang I kec. M.Uya | Tender | Pekerjaan Konstruksi | 2992059 | 21827046 | APBD | 1,500,000,000 | 1,499,988,999 | 1,455,306,247 | 1,455,306,247 | 1,454,750,000 | 1,454,750,000 | 0 | 0 | 2019-10-02 | 2019-10-15 | 2019-10-18 | 01.124.248.4-735.000 | CV. SETIA WARGA | 01.124.248.4-735.000 | CV. SETIA WARGA | 44,693,753 | 2.98 % | Belum dinilai |
71 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Murung Pudak Luar Kota | Tender | Jasa Lainnya | 2488059 | 20190965 | APBD | 238,262,750 | 215,849,900 | 209,493,900 | 209,493,900 | 209,321,200 | 209,321,200 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 28,768,850 | 12.07 % | Belum dinilai |
72 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Jalan Tohe - Danau Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2618059 | 19674763 | APBD | 1,925,845,000 | 1,924,196,784 | 1,802,889,624 | 1,802,889,624 | 1,799,368,000 | 1,799,368,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-20 | 02.919.061.8-735.000 | CV. Multi Raya Kambitin | 0029190618735000 | CV. Multi Raya Kambitin | 122,955,376 | 6.38 % | Belum dinilai |
73 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Saluran Drainase/Gorong-gorong Jalan Subur - Ayah (Randu) Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2625059 | 19693879 | APBD | 500,000,000 | 499,934,143 | 479,932,878 | 479,932,878 | 479,932,000 | 479,932,000 | 0 | 0 | 2019-05-23 | 2019-06-17 | 2019-06-26 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 20,067,122 | 4.01 % | Belum dinilai |
74 | 2019 | DINAS PEMBERDAYAAN PEREMPUAN PERLINDUNGAN ANAK PENGENDALIAN PENDUDUK DAN KB | Bangunan Balai Penyuluhan KB 2 Buah (2 Kecamatan),Pengadaan Alat Kantor dan Pengadaan Alat Rumah Tangga | Tender | Pekerjaan Konstruksi | 2650059 | 21664233 | APBD | 951,425,000 | 950,740,282 | 899,801,132 | 899,801,132 | 899,801,132 | 899,801,132 | 0 | 0 | 2019-06-11 | 2019-06-20 | 2019-07-02 | 83.673.082.0-735.000 | CV. BIMA PERSADA | 0836730820735000 | CV. BIMA PERSADA | 51,623,868 | 5.43 % | Belum dinilai |
75 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Balanti Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2898059 | 21895162 | APBD | 450,000,000 | 449,248,912 | 427,000,001 | 427,000,001 | 427,000,000 | 427,000,000 | 0 | 0 | 2019-08-23 | 2019-09-04 | 2019-09-06 | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 02.224.076.6-735.000 | CV. SUMBER USAHA PUTRA | 22,999,999 | 5.11 % | Belum dinilai |
76 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Sheet Pile Desa Kapar Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2902059 | 21821819 | APBD | 1,000,000,000 | 999,999,888 | 984,545,328 | 984,545,328 | 978,886,000 | 978,886,000 | 0 | 0 | 2019-08-29 | 2019-09-11 | 2019-09-30 | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 31.245.996.9-731.000 | CV.RIDHEVAL HANDIL BHAKTI | 15,454,672 | 1.55 % | Belum dinilai |
77 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Penyiringan Saluran Irigasi Desa Liang Tapah Kec. Jaro | Tender | Pekerjaan Konstruksi | 2802059 | 21516684 | APBD | 828,000,000 | 821,882,693 | 770,000,000 | 770,000,000 | 770,000,000 | 770,000,000 | 0 | 0 | 2019-08-01 | 2019-08-15 | 2019-08-28 | 02.475.451.7-735.000 | CV. YUDHA DARMA MANDIRI | 02.475.451.7-735.000 | CV. YUDHA DARMA MANDIRI | 58,000,000 | 7 % | Belum dinilai |
78 | 2019 | DINAS KESEHATAN | Pembangunan Gedung Rumah sakit | Tender | Pekerjaan Konstruksi | 2824059 | 21766837 | APBD | 24,333,079,800 | 23,945,543,000 | 22,029,966,235 | 22,029,966,235 | 22,029,966,235 | 22,029,966,234 | 0 | 0 | 2019-07-29 | 2019-08-10 | 2019-08-21 | 02.111.029.1-712.000 | pt. heral eranio jaya | 02.111.029.1-712.000 | pt. heral eranio jaya | 2,303,113,565 | 9.46 % | Belum dinilai |
79 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Siring Jembatan Gantung Marindi Kec. Haruai | Tender | Pekerjaan Konstruksi | 2987059 | 21903658 | APBDP | 626,915,000 | 626,915,000 | 580,000,001 | 580,000,001 | 570,181,000 | 570,181,000 | 0 | 0 | 2019-10-01 | 2019-10-14 | 2019-10-16 | 02.919.299.4-735.000 | CV.SPACE PLAN | 02.919.299.4-735.000 | CV.SPACE PLAN | 46,914,999 | 7.48 % | Belum dinilai |
80 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Rehab Pagar, Halaman, Tempat Parkir dan WC Out Door | Tender | Pekerjaan Konstruksi | 2899059 | 21925321 | APBD | 605,993,385 | 605,993,047 | 581,755,404 | 581,227,404 | 581,227,000 | 581,227,000 | 0 | 0 | 2019-08-31 | 2019-09-11 | 2019-09-17 | 02.590.745.2-735.000 | CV. BANGUN BANUA | 0025907452735000 | CV. BANGUN BANUA | 24,237,981 | 4 % | Belum dinilai |
81 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Modal Pembangunan Trotoar Mabuun-Batas Kota Kec. Murung Pudak (DID Kesejahteraan) - Pembangunan Trotoar Mabuun-Batas Kota Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2793059 | 21788643 | APBD | 2,782,974,000 | 2,782,973,930 | 2,646,144,691 | 2,646,144,691 | 2,646,144,691 | 2,646,144,690 | 0 | 0 | 2019-07-12 | 2019-07-24 | 2019-07-31 | 83.684.580.0-735.000 | CV. MAHKOTA PUTRI MANDIRI | 0836845800735000 | CV. MAHKOTA PUTRI MANDIRI | 136,829,309 | 4.92 % | Belum dinilai |
82 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Binjai - Salikung Kec. Muara Uya, Peningkatan Jalan Sp.3 Kumap - Desa Kumap Kec. Muara Uya dan Peningkatan Jalan Salikung - Memban Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2866059 | 21882141 | APBD | 7,750,000,000 | 7,749,981,934 | 7,643,186,284 | 7,643,186,284 | 7,643,186,000 | 7,643,186,000 | 0 | 0 | 2019-08-13 | 2019-08-24 | 2019-09-02 | 70.071.507.1-735.000 | CV.T ANJUNG MURIA | 0700715071735000 | CV.T ANJUNG MURIA | 106,813,716 | 1.38 % | Belum dinilai |
83 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Jembatan Slab Beton Desa Masukau Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2872059 | 21895163 | APBD | 3,000,000,000 | 2,999,983,913 | 2,950,000,014 | 2,950,000,014 | 2,935,000,000 | 2,935,000,000 | 0 | 0 | 2019-08-16 | 2019-08-27 | 2019-09-03 | 02.675.210.5-735.000 | cv.sumber karya mulia | 02.675.210.5-735.000 | cv.sumber karya mulia | 49,999,986 | 1.67 % | Belum dinilai |
84 | 2019 | DINAS KESEHATAN | Pembangunan Baru Poskesdes Kapar Kecamatan Murung Pudak | Tender | Pekerjaan Konstruksi | 2855059 | 21766818 | APBD | 350,000,000 | 347,210,000 | 332,581,077 | 332,581,077 | 329,000,000 | 329,000,000 | 0 | 0 | 2019-08-16 | 2019-08-27 | 2019-09-02 | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 74.318.464.0-735.000 | CV DWI KARYA SELARAS | 17,418,923 | 4.98 % | Belum dinilai |
85 | 2019 | DINAS PERHUBUNGAN | Paket II (Rehabilitasi Marka Jalan/Zebra Cross di Jalan Kabupaten Luar Kawasan Tertib Lalu Lintas | Tender | Pekerjaan Konstruksi | 2973059 | 21919484 | APBDP | 865,500,000 | 801,870,455 | 761,749,249 | 761,749,249 | 761,749,000 | 761,749,000 | 0 | 0 | 2019-09-25 | 2019-10-07 | 2019-10-16 | 02.590.439.2-735.000 | CV.KELUA MANDIRI | 0025904392735000 | CV.KELUA MANDIRI | 103,750,751 | 11.99 % | Belum dinilai |
86 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengaspalan Halaman Kantor Kejaksaan Negeri Tanjung | Tender | Pekerjaan Konstruksi | 2819059 | 21811986 | APBD | 525,000,000 | 359,545,708 | 348,421,018 | 348,421,018 | 348,421,000 | 348,421,000 | 0 | 0 | 2019-07-26 | 2019-08-07 | 2019-08-12 | 90.165.294.1-735.000 | CV. BANUA PRIMA | 90.165.294.1-735.000 | CV. BANUA PRIMA | 176,578,982 | 33.63 % | Belum dinilai |
87 | 2019 | DINAS PERHUBUNGAN | Pembangunan Tempat Parkir / Garasi/ Pool Angkutan | Tender | Pekerjaan Konstruksi | 2607059 | 19845871 | APBD | 370,000,000 | 369,986,375 | 359,528,534 | 359,528,534 | 359,528,000 | 359,528,000 | 0 | 0 | 2019-05-17 | 2019-05-29 | 2019-07-04 | 02.675.218.8-735.000 | CV.KARTIKA RANCANG PRATAMA | 0026752188735000 | CV.KARTIKA RANCANG PRATAMA | 10,471,466 | 2.83 % | Belum dinilai |
88 | 2019 | DINAS KETAHANAN PANGAN | Pembangunan gudang cadangan pangan pemerintah daerah | Tender | Pekerjaan Konstruksi | 2659059 | 20781830 | APBD | 1,700,000,000 | 1,699,978,713 | 1,615,068,504 | 1,615,068,504 | 1,615,068,504 | 1,615,068,504 | 0 | 0 | 2019-06-13 | 2019-06-24 | 2019-07-04 | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 01.424.474.3-735.000 | CV. USAHA BERSAMA | 84,931,496 | 5 % | Belum dinilai |
89 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Ruang CAT dan Ruang Arsip dan Pagar Badan Kepegawaian Pendidikan dan Pelatihan Kab. Tabalong | Tender | Pekerjaan Konstruksi | 2682059 | 21684953 | APBD | 883,889,000 | 883,884,463 | 857,265,198 | 857,265,198 | 857,265,000 | 857,265,000 | 0 | 0 | 2019-06-18 | 2019-06-27 | 2019-07-05 | 02.590.435.0-735.000 | CV. ANDIN WIRANDY | 0025904350735000 | CV. ANDIN WIRANDY | 26,623,802 | 3.01 % | Belum dinilai |
90 | 2019 | DINAS KOPERASI USAHA KECIL DAN MENENGAH | Pembangunan PLUT-KUMKM | Tender | Pekerjaan Konstruksi | 2785059 | 21772303 | APBN | 2,043,046,000 | 2,043,037,765 | 1,930,000,778 | 1,930,000,778 | 1,930,000,778 | 0 | 0 | 0 | 2019-07-16 | 2019-07-26 | 83.673.082.0-735.000 | CV. BIMA PERSADA | 113,045,222 | 5.53 % | Belum dinilai | |||
91 | 2019 | DINAS TENAGA KERJA | Belanja Modal Gedung dan Bangunan - Pengadaan Bangunan Gedung Kantor- Belanja modal pembangunan ruang kelas dan ruang praktek | Tender | Pekerjaan Konstruksi | 2782059 | 21766884 | APBD | 533,325,000 | 532,334,232 | 516,271,611 | 516,271,611 | 510,206,130 | 510,206,130 | 0 | 0 | 2019-07-24 | 2019-08-06 | 2019-09-02 | 02.590.482.2-735.000 | CV. KARYA PERDANA | 02.590.482.2-735.000 | CV. KARYA PERDANA | 17,053,389 | 3.2 % | Belum dinilai |
92 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Kaong - Manakin Kec. Upau | Tender | Pekerjaan Konstruksi | 2787059 | 21708706 | APBD | 1,250,000,000 | 1,249,950,107 | 1,221,052,418 | 1,221,052,418 | 1,221,050,000 | 1,221,050,000 | 0 | 0 | 2019-07-11 | 2019-07-23 | 2019-08-05 | 02.935.016.2-735.000 | CV TABALONG | 02.935.016.2-735.000 | CV TABALONG | 28,947,582 | 2.32 % | Belum dinilai |
93 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan Jalan Tamrin 1 Kel.Mabuun Kec.Murung Pudak | Tender | Pekerjaan Konstruksi | 3006059 | 21825355 | APBD | 350,000,000 | 349,998,696 | 343,057,600 | 343,057,600 | 343,057,000 | 0 | 0 | 0 | 2019-10-10 | 2019-10-23 | 15.129.641.5-735.000 | CV. TANJUNG PUTRA | 6,942,400 | 1.98 % | Belum dinilai | |||
94 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan Jalan Tamrin Kel.Mabuun Kec.Murung Pudak | Tender | Pekerjaan Konstruksi | 3003059 | 21826112 | APBD | 450,000,000 | 449,988,584 | 442,338,908 | 442,338,908 | 442,336,000 | 442,336,000 | 0 | 0 | 2019-10-09 | 2019-10-21 | 2019-10-24 | 01.428.401.2-735.000 | CV.BAHTERA RACHMAN AGUNG | 0014284012735000 | CV.BAHTERA RACHMAN AGUNG | 7,661,092 | 1.7 % | Belum dinilai |
95 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Mangkupum - Jambu Kec. Muara Uya | Tender | Pekerjaan Konstruksi | 2778059 | 21778509 | APBD | 1,500,000,000 | 1,499,999,652 | 1,455,185,360 | 1,455,185,360 | 1,455,185,000 | 1,455,185,000 | 0 | 0 | 2019-07-09 | 2019-07-22 | 2019-07-26 | 01.123.972.0-735.000 | CV. ANALIS | 0011239720735000 | CV. ANALIS | 44,814,640 | 2.99 % | Belum dinilai |
96 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Modal Pem. Berkala Jl Mahe-Pujung-Burum Kec. Bintang Ara (DID Infrastruktur)-Pemeliharaan Berkala Jalan Mahe-Pujung-Burum Kec. Bintang Ara | Tender | Pekerjaan Konstruksi | 2549059 | 21118316 | APBD | 5,887,585,000 | 5,887,035,942 | 5,448,903,200 | 5,448,903,200 | 5,448,903,000 | 5,448,903,000 | 0 | 0 | 2019-05-09 | 2019-05-22 | 2019-05-29 | 02.590.894.8-735.000 | CV. NUR SHIFFA | 0025908948735000 | CV. NUR SHIFFA | 438,681,800 | 7.45 % | Belum dinilai |
97 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Bataman - Fajar Baru Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2822059 | 21819392 | APBD | 600,000,000 | 599,925,763 | 573,048,503 | 573,048,503 | 573,048,000 | 573,048,000 | 0 | 0 | 2019-07-29 | 2019-08-07 | 2019-08-13 | 02.590.745.2-735.000 | CV. BANGUN BANUA | 0025907452735000 | CV. BANGUN BANUA | 26,951,497 | 4.49 % | Belum dinilai |
98 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Drainase Jalan Basuki Rahmat - Hikun Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2861059 | 21867065 | APBD | 568,699,150 | 568,318,476 | 545,528,525 | 545,528,525 | 545,528,000 | 545,528,000 | 0 | 0 | 2019-08-12 | 2019-08-21 | 2019-08-27 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 23,170,625 | 4.07 % | Belum dinilai |
99 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Pipa Distribusi Air Minum Kawasan Tanjung Baru (DDUB) | Tender | Pekerjaan Konstruksi | 2627059 | 19453795 | APBD | 2,500,000,000 | 2,499,958,694 | 2,317,266,792 | 2,317,266,792 | 2,317,266,000 | 2,317,266,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-25 | 02.590.469.9-735.000 | Cv wanda | 0025904699735000 | Cv wanda | 182,733,208 | 7.31 % | Belum dinilai |
100 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan dan Pemasangan Line PJU | Tender | Pekerjaan Konstruksi | 2587059 | 20190959 | APBD | 270,000,000 | 269,310,000 | 244,333,100 | 244,333,100 | 244,333,100 | 244,333,100 | 0 | 0 | 2019-05-03 | 2019-05-16 | 2019-05-27 | 82.602.342.6-731.000 | PT. PEMASANGAN BARU DUA SEMBILAN | 82.602.342.6-731.000 | PT. PEMASANGAN BARU DUA SEMBILAN | 25,666,900 | 9.51 % | Belum dinilai |
101 | 2019 | DINAS LINGKUNGAN HIDUP | Pekerjaan Konstruksi Sumur Bor, Pompa Air dan Tempat Cuci Kendaraan TPA Bongkang | Tender | Pekerjaan Konstruksi | 2634059 | 19641128 | APBD | 485,000,000 | 484,999,990 | 468,823,545 | 468,823,545 | 468,823,000 | 468,823,000 | 0 | 0 | 2019-05-27 | 2019-06-17 | 2019-06-28 | 01.214.211.3-732.000 | cv.wasis | 01.214.211.3-732.000 | cv.wasis | 16,176,455 | 3.34 % | Belum dinilai |
102 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan dan Pemasangan dan Panel Kontrol | Tender | Pekerjaan Konstruksi | 2595059 | 20190960 | APBD | 420,000,000 | 419,877,000 | 392,986,770 | 392,986,770 | 392,986,770 | 392,986,770 | 0 | 0 | 2019-05-06 | 2019-05-24 | 2019-06-12 | 71.381.268.3-735.000 | CV ORTANG | 71.381.268.3-735.000 | CV ORTANG | 27,013,230 | 6.43 % | Belum dinilai |
103 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Saluran Air Desa Padangin RT.2 Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2865059 | 21516685 | APBD | 759,000,000 | 751,212,846 | 660,000,011 | 657,800,011 | 657,800,011 | 657,800,011 | 0 | 0 | 2019-08-15 | 2019-08-27 | 2019-09-10 | 02.919.299.4-735.000 | CV.SPACE PLAN | 02.919.299.4-735.000 | CV.SPACE PLAN | 98,999,989 | 13.04 % | Belum dinilai |
104 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) | Tender | Pekerjaan Konstruksi | 2762059 | 21745003 | APBD | 5,175,000,000 | 5,174,904,436 | 4,889,114,806 | 4,889,114,806 | 4,887,309,000 | 0 | 0 | 0 | 2019-07-05 | 2019-07-16 | 01.919.004.8-735.000 | CV. EDU RISKA | 285,885,194 | 5.52 % | Belum dinilai | |||
105 | 2019 | DINAS PERIKANAN | Paket Budidaya Patin di Kolam | Tender | Pengadaan Barang | 2642059 | 21658608 | APBD | 386,750,000 | 380,698,500 | 374,795,005 | 374,795,005 | 373,692,000 | 373,692,000 | 0 | 0 | 2019-05-29 | 2019-06-17 | 2019-07-01 | 02.590.608.2-732.000 | CV. MEGA CIPTA SARANA | 02.590.608.2-732.000 | CV. MEGA CIPTA SARANA | 11,954,995 | 3.09 % | Belum dinilai |
106 | 2019 | DINAS PERINDUSTRIAN DAN PERDAGANGAN | Revitalisasi Pasar Mahe Kecamatan Haruai | Tender | Pekerjaan Konstruksi | 2703059 | 21694199 | APBD | 1,333,473,000 | 1,331,087,553 | 1,179,008,101 | 1,179,008,101 | 1,179,008,101 | 1,179,008,101 | 0 | 0 | 2019-06-24 | 2019-07-05 | 2019-07-17 | 83.673.082.0-735.000 | CV. BIMA PERSADA | 0836730820735000 | CV. BIMA PERSADA | 154,464,899 | 11.58 % | Belum dinilai |
107 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan Mangkusip - Pamarangan Kec. Tanta | Tender | Pekerjaan Konstruksi | 2776059 | 19663578 | APBD | 1,000,000,000 | 999,573,880 | 984,575,836 | 984,575,836 | 984,575,000 | 984,575,000 | 0 | 0 | 2019-07-10 | 2019-07-19 | 2019-07-25 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 15,424,164 | 1.54 % | Belum dinilai |
108 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Tantaringin - Sp. 3 Padangin Kec. Muara Harus | Tender | Pekerjaan Konstruksi | 2799059 | 19674463 | APBD | 950,000,000 | 949,921,120 | 902,500,469 | 902,500,469 | 889,705,000 | 889,705,000 | 0 | 0 | 2019-07-15 | 2019-07-25 | 2019-08-07 | 02.421.698.8-732.000 | CV. PUTRA TUNGGAL ANNOR | 02.421.698.8-732.000 | CV. PUTRA TUNGGAL ANNOR | 47,499,531 | 5 % | Belum dinilai |
109 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Sp. 3 Cenderawasih - Bangun Sari | Tender | Pekerjaan Konstruksi | 2810059 | 19674432 | APBD | 950,000,000 | 941,716,297 | 855,000,760 | 855,000,760 | 855,000,760 | 855,000,700 | 0 | 0 | 2019-07-22 | 2019-07-31 | 2019-08-09 | 81.211.787.7-735.000 | CV. SEMAN SHATI | 81.211.787.7-735.000 | CV. SEMAN SHATI | 94,999,240 | 10 % | Belum dinilai |
110 | 2019 | DINAS PEMBERDAYAAN MASYARAKAT DAN PEMERINTAHAN DESA | Belanja Pakaian Batik Tradisional | Tender | Pengadaan Barang | 2555059 | 21401333 | APBD | 611,600,000 | 611,600,000 | 473,990,000 | 473,990,000 | 382,250,000 | 382,250,000 | 0 | 0 | 2019-04-18 | 2019-05-02 | 2019-05-13 | 31.329.425.8-424.000 | izzata | 31.329.425.8-424.000 | izzata | 137,610,000 | 22.5 % | Belum dinilai |
111 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Peningkatan Jalan kambitin - Wayau (lanjutan) Kec. Tanjung | Tender | Pekerjaan Konstruksi | 2629059 | 19663624 | APBD | 800,000,000 | 793,195,838 | 753,525,049 | 753,525,049 | 753,525,000 | 753,525,000 | 0 | 0 | 2019-05-28 | 2019-06-18 | 2019-06-24 | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 66.682.347.1-735.000 | CV. PUTRA BARIMBUN MANDIRI | 46,474,951 | 5.81 % | Belum dinilai |
112 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengadaan dan Pemasangan SHS PLTS di Desa Panaan RT 3 Kp Kuari sebanyak 45 Unit | Tender | Jasa Lainnya | 2924059 | 21926584 | APBDP | 422,495,000 | 405,469,350 | 405,126,700 | 405,126,700 | 405,126,700 | 405,126,700 | 0 | 0 | 2019-09-12 | 2019-09-24 | 2019-09-30 | 02.918.066.8-733.000 | CV. CAESSAR | 02.918.066.8-733.000 | CV. CAESSAR | 17,368,300 | 4.11 % | Belum dinilai |
113 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Belanja Modal Pem. Berkala Jl Banua Rantau-Habau Kec. Bn. Lawas (DID Kesejahteraan)-Pemeliharaan Berkala Jalan Banua Rantau-Habau Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2557059 | 21124691 | APBD | 2,391,345,000 | 2,391,335,085 | 2,342,977,517 | 2,341,333,017 | 2,341,000,000 | 2,341,000,000 | 0 | 0 | 2019-05-02 | 2019-05-14 | 2019-05-23 | 01.124.248.4-735.000 | CV. SETIA WARGA | 01.124.248.4-735.000 | CV. SETIA WARGA | 48,367,483 | 2.02 % | Belum dinilai |
114 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan Siring Murung Mahang Desa Jirak RT.3 Kec. Pugaan | Tender | Pekerjaan Konstruksi | 2814059 | 21670400 | APBD | 634,800,000 | 631,515,601 | 594,986,903 | 594,875,187 | 589,112,000 | 0 | 0 | 0 | 2019-07-26 | 2019-08-06 | 02.919.453.7-735.000 | cv rodhita | 39,813,097 | 6.27 % | Belum dinilai | |||
115 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pemeliharaan Berkala Jalan Suput - Kambitin Kec. Haruai | Tender | Pekerjaan Konstruksi | 2768059 | 19674818 | APBD | 1,357,340,000 | 1,357,312,785 | 1,289,045,703 | 1,289,045,703 | 1,289,045,000 | 1,289,045,000 | 0 | 0 | 2019-07-09 | 2019-07-19 | 2019-07-24 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 68,294,297 | 5.03 % | Belum dinilai |
116 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Rehabilitasi Jalan Usaha Tani D.I.R Banua Lawas Kec. Banua Lawas | Tender | Pekerjaan Konstruksi | 2827059 | 21516655 | APBD | 485,760,000 | 481,526,652 | 467,511,699 | 467,511,699 | 467,511,000 | 467,511,000 | 0 | 0 | 2019-07-29 | 2019-08-08 | 2019-08-13 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 18,248,301 | 3.76 % | Belum dinilai |
117 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pemeliharaan PJU Kecamatan Tanjung Luar Kota | Tender | Jasa Lainnya | 2490059 | 20190963 | APBD | 233,870,900 | 225,200,027 | 217,620,975 | 217,620,975 | 217,427,375 | 217,427,375 | 0 | 0 | 2019-03-12 | 2019-03-25 | 2019-04-04 | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 02.236.951.6-732.000 | CV. INDO SETIA TEKNIK | 16,249,925 | 6.95 % | Belum dinilai |
118 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Penanganan PSU Perumahan Istana Al Faza Mabuun | Tender | Pekerjaan Konstruksi | 3033059 | 21887371 | APBD | 385,347,000 | 385,344,688 | 381,302,382 | 381,302,382 | 381,300,000 | 381,300,000 | 0 | 0 | 2019-10-16 | 2019-10-24 | 2019-10-29 | 72.168.809.1-735.000 | Dina utama abadi | 0721688091735000 | Dina utama abadi | 4,044,618 | 1.05 % | Belum dinilai |
119 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembangunan Saluran Drainase/Gorong-gorong Jalan Sp. 3 Pembataan - Komperta Kec. Murung Pudak | Tender | Pekerjaan Konstruksi | 2863059 | 21867021 | APBD | 861,365,000 | 861,364,643 | 847,178,709 | 847,178,709 | 847,177,000 | 847,177,000 | 0 | 0 | 2019-08-12 | 2019-08-22 | 2019-08-27 | 31.669.359.7-735.000 | CV.WARDHANA | 0316693597735000 | CV.WARDHANA | 14,186,291 | 1.65 % | Belum dinilai |
120 | 2019 | DINAS PERUMAHAN RAKYAT KAWASAN PEMUKIMAN DAN PERTANAHAN | Pengaspalan Jalan Reformasi Kasiau Raya | Tender | Pekerjaan Konstruksi | 2994059 | 21826223 | APBD | 454,975,000 | 454,591,546 | 447,463,353 | 447,463,353 | 447,463,000 | 447,463,000 | 0 | 0 | 2019-10-03 | 2019-10-14 | 2019-10-18 | 02.919.041.0-735.000 | CV. DO'A ORANG TUA | 0029190410735000 | CV. DO'A ORANG TUA | 7,511,647 | 1.65 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | BADAN PENANGGULANGAN BENCANA DAERAH | Pengadaan Buku Laporan Penyusunan Dokumen Rencana Induk Sistem Proteksi Kebakaran | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2850059 | 19488697 | APBD | 323,321,850 | 300,190,000 | 300,080,000 | 300,080,000 | 300,080,000 | 300,080,000 | 0 | 0 | 2019-08-14 | 2019-09-19 | 2019-09-27 | 01.548.564.2-424.000 | PT. Belaputera Interplan | 0015485642424000 | PT. Belaputera Interplan | 23,241,850 | 7.19 % | Belum dinilai |
2 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pembuatan DED Kebun Raya Tanjung Puri | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2581059 | 21486890 | APBD | 505,000,000 | 504,020,000 | 490,080,800 | 490,080,800 | 490,080,800 | 490,080,800 | 0 | 0 | 2019-05-03 | 2019-06-18 | 2019-07-27 | 01.463.263.2-731.000 | PT. MATRA ESTETIKA REKAYASA | 0014632632731000 | PT. MATRA ESTETIKA REKAYASA | 14,919,200 | 2.95 % | Belum dinilai |
3 | 2019 | PDAM Kabupaten Tabalong | Jasa Konsultan pengawasan Pembangunan IPA kapasitas 50 Liter/detik, rehab rumah jaga operator menjadi bengkel meter dan gedung laboratorium. | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2717059 | 21367293 | BUMD | 310,000,000 | 298,353,000 | 297,649,000 | 297,649,000 | 289,905,000 | 289,905,000 | 0 | 0 | 2019-07-03 | 2019-08-13 | 2019-08-29 | 02.215.319.1-732.000 | CV. POLA ARSITEK KONSULTAN | 0022153191732000 | CV. POLA ARSITEK KONSULTAN | 12,351,000 | 3.98 % | Belum dinilai |
4 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Teknis Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2453059 | 19455125 | APBD | 250,000,000 | 249,947,500 | 248,215,000 | 248,215,000 | 248,215,000 | 248,215,000 | 0 | 0 | 2019-02-21 | 2019-03-28 | 2019-04-15 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 0024308173731000 | PT. KINARYA ALAM RAYA | 1,785,000 | 0.71 % | Belum dinilai |
5 | 2019 | DINAS KESEHATAN | jasa konsultan pengawasan Pembangunan Gedung Rumah sakit | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2767059 | 21766832 | APBD | 511,544,500 | 511,544,500 | 414,854,000 | 414,854,000 | 414,854,000 | 414,854,000 | 0 | 0 | 2019-07-12 | 2019-08-12 | 2019-08-21 | 01.555.547.7-429.000 | PT. ALOCITA MANDIRI | 01.555.547.7-429.000 | PT. ALOCITA MANDIRI | 96,690,500 | 18.9 % | Belum dinilai |
6 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Teknis Pengadaan dan Pemasangan Pipa Jaringan PDAM Desa Tamunti dan Desa Sei Rukam II Kecamatan Pugaan | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2449059 | 19452936 | APBD | 180,000,000 | 179,960,000 | 176,550,000 | 176,550,000 | 176,550,000 | 176,550,000 | 0 | 0 | 2019-02-19 | 2019-03-28 | 2019-04-15 | 01.647.863.8-731.000 | CV. Mitra Jasa | 01.647.863.8-731.000 | CV. Mitra Jasa | 3,450,000 | 1.92 % | Belum dinilai |
7 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Jasa Konsultansi Revisi RTRW Kabupaten Tabalong. | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2594059 | 21488450 | APBD | 700,000,000 | 685,693,250 | 685,300,000 | 685,300,000 | 685,300,000 | 685,300,000 | 0 | 0 | 2019-05-07 | 2019-06-20 | 2019-07-03 | 02.430.817.3-731.000 | PT. KINARYA ALAM RAYA | 0024308173731000 | PT. KINARYA ALAM RAYA | 14,700,000 | 2.1 % | Belum dinilai |
8 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Teknis Pengadaan dan Pemasangan Pipa Distribusi Air Minum IKK Bintang Ara (DDUB) | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2759059 | 21744874 | APBD | 150,000,000 | 149,820,000 | 148,032,500 | 148,032,500 | 148,032,500 | 148,032,500 | 0 | 0 | 2019-07-04 | 2019-08-09 | 2019-08-27 | 02.531.482.4-731.000 | cv.akmalindo | 02.531.482.4-731.000 | cv.akmalindo | 1,967,500 | 1.31 % | Belum dinilai |
9 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Pengawasan Teknis Pengadaan dan Pemasangan Pipa Distribusi IKK Upau ke arah Desa Masingai I dan II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2761059 | 21744906 | APBD | 176,775,000 | 176,137,500 | 171,008,750 | 171,008,750 | 171,008,750 | 171,008,750 | 0 | 0 | 2019-07-09 | 2019-08-14 | 2019-08-28 | 02.531.482.4-731.000 | cv.akmalindo | 02.531.482.4-731.000 | cv.akmalindo | 5,766,250 | 3.26 % | Belum dinilai |
10 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Review Perencanaan Teknis Pembangunan Jalan Tanjung Baru - Tanjung Selatan Kec. Murung Pudak | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2945059 | 21903145 | APBDP | 168,959,687 | 167,915,000 | 167,299,000 | 167,299,000 | 167,299,000 | 167,299,000 | 0 | 0 | 2019-09-23 | 2019-10-24 | 2019-11-07 | 76.278.662.2-732.000 | CV. Mitra Arsindo Consultant | 0762786622732000 | CV. Mitra Arsindo Consultant | 1,660,687 | 0.98 % | Belum dinilai |
11 | 2019 | DINAS PEKERJAAN UMUM DAN PENATAAN RUANG | Perencanaan Teknis Pengadaan dan Pemasangan Pipa Distribusi IKK Upau Ke arah Desa Masingai I dan II | Seleksi | Jasa Konsultansi Badan Usaha Non Konstruksi | 2448059 | 19455756 | APBD | 294,625,000 | 294,607,500 | 280,005,000 | 280,005,000 | 280,005,000 | 280,005,000 | 0 | 0 | 2019-02-19 | 2019-03-28 | 2019-04-15 | 01.647.863.8-731.000 | CV. Mitra Jasa | 01.647.863.8-731.000 | CV. Mitra Jasa | 14,620,000 | 4.96 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2019 | DINAS LINGKUNGAN HIDUP | Pengadaan Alat Angkut Sampah Dump Truck ( DAK Penugasan Bidang Lingkungan Hidup ) | Tender Cepat | Pengadaan Barang | 2668059 | 21685496 | APBD | 420,000,000 | 412,190,000 | 411,140,000 | 411,140,000 | 411,140,000 | 411,140,000 | 0 | 0 | 2019-06-17 | 2019-06-19 | 2019-06-24 | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 8,860,000 | 2.11 % | Belum dinilai |
2 | 2019 | DINAS LINGKUNGAN HIDUP | Pengadaan Sweeper Truck | Tender Cepat | Pengadaan Barang | 2920059 | 21894304 | APBDP | 3,389,215,000 | 3,282,900,000 | 3,255,000,000 | 3,255,000,000 | 3,255,000,000 | 3,255,000,000 | 0 | 0 | 2019-09-16 | 2019-09-17 | 2019-10-01 | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 02.575.821.0-732.000 | PT. Mitra Profitamas Motor | 134,215,000 | 3.96 % | Belum dinilai |
No | Tahun Anggaran | Nama Satker | Nama Paket | Metode Pemilihan | Jenis Pengadaan | Kode Tender | Kode RUP | Sumber Dana | Pagu | HPS | Nilai Penawaran | Nilai Terkoreksi | Nilai Negosiasi | Nilai Kontrak | Nilai PDN Kontrak | Nilai UMK Kontrak | Tanggal Pengumuman Tender | Tanggal Penetapan Pemenang | Tanggal Kontrak | NPWP Penyedia Pemenang Tender | Nama Penyedia Pemenang Tender | NPWP Penyedia Berkontrak | Nama Penyedia Berkontrak | Sisa Selisih Pagu (silpa) | Persentase Silpa | Nilai Kinerja Penyedia |